Phase D: Pre-Cutover Testing

Phase D: Pre-Cutover Testing ✅ COMPLETE

Parallel testing with pfSense still primary, followed by controlled cutover to VyOS. All services validated before pfSense was removed from the forwarding path.

Checklist

Step Status Description Reference

D.1

[x]

Parallel testing (pfSense still primary)

Phase 13

D.2

[x]

Cutover from pfSense to VyOS

Phase 14

Checkpoint Validation

# Internet works through VyOS
traceroute -n 8.8.8.8 | head -5  # First hop should be 10.50.1.3 (vyos-02.inside.domusdigitalis.dev)
ping -c3 8.8.8.8