Verification Checklists
Pre-Change Verification
| Check | Status |
|---|---|
VLAN ID confirmed as available (not in use) on all SRT switches |
[ ] |
DHCP scope provisioned for research subnet (if applicable) |
[ ] |
ISE policy set backup taken (Policy → System → Backup) |
[ ] |
Switch configurations backed up ( |
[ ] |
Test endpoint identified and available for David |
[ ] |
Communication sent to affected stakeholders |
[ ] |
Post-Change Verification
| Check | Status |
|---|---|
VLAN exists on all SRT access switches ( |
[ ] |
VLAN name consistent across all switches |
[ ] |
VLAN allowed on all trunks to Nexus distribution |
[ ] |
VLAN present on Nexus distribution |
[ ] |
Spanning-tree topology stable for new VLAN |
[ ] |
ISE Authorization Profile created and saved |
[ ] |
ISE Authorization Rule active in correct policy set |
[ ] |
Test endpoint authenticates via 802.1X |
[ ] |
Test endpoint assigned to correct VLAN |
[ ] |
Test endpoint receives correct IP via DHCP |
[ ] |
DACL applied to test endpoint |
[ ] |
RADIUS Live Logs confirm expected AuthZ Profile |
[ ] |