PeopleSoft Time Entry

Quick reference for PeopleSoft time entry - project codes, standard administrative codes, and activity hour baselines.

Project Codes

Active Projects — With Codes

Project Code Combo Activity PM Parent

Recognition Kiosk (Poppulo) - IS Labor

000018166

000018623

20

Spectrum TV/GetWell iPad Refresh

000016444

000018551

20

Azure Legacy Migration

000018100

000018619

20

Cisco Secure Endpoint Replacement

000017633

000018546

Windows 11 Device Hardening

000017706

000018549

MSCHAPv2 to EAP-TLS Migration

000018420

Will Cox

IR PACU (Radiology BMS)

00016938

Alexander Urasaki

BMS Device Inventory

PET-CT, TDR (Radiology BMS)

00016937

Alexander Urasaki

BMS Device Inventory

SIEM Migration & Monitoring

Project Code Combo Activity PM Parent

SIEM Upgrade or Replacement FY26

000018281

Vanessa Ahn

QRadar → Sentinel Migration (LEAD)

Vanessa Ahn

SIEM Upgrade FY26

Monad Pipeline Evaluation

Vanessa Ahn

SIEM Upgrade FY26

Sentinel KQL Development

Vanessa Ahn

SIEM Upgrade FY26

Centralized rsyslog Server

Vanessa Ahn

SIEM Upgrade FY26

VNC Blocking (due mid-June)

SIEM Upgrade FY26

Security & Compliance

Project Code Combo Activity PM Parent

Abnormal Email Security FY26

000018379

Will Cox

Mandiant Remediation

Firewall Audit

Murus Portae (WAF/Segmentation)

DMZ Migration

Research Segmentation

ISE Patch 10 / CVE Remediation

ISE & Network Access

Project Code Combo Activity PM Parent

ISE 3.2 → 3.5 Migration

ISE Hardware Refresh

✅ COMPLETE

ISE Annual Cert Renewal

NEEDS CODE — on timesheets

IPSK Manager HA

Enterprise Linux 802.1X / Remediation

NEEDS CODE — on timesheets

Vocera EAP-TLS Supplicant Fix

Strongline Gateway

Spikewell BYOD VPN

ChromeOS EAP-TLS

Victor / Paul

Deployments & Inventory

Project Code Combo Activity PM Parent

BMS Device Inventory

Alexander Urasaki

BMS Controller Segmentation

BMS Device Inventory

TCP Clocks Deployment

000016014

Chris Muburi

60 hrs approved (2026-06-23)

Downtime Computers Enforcement

Tube System Upgrade

NEEDS CODE — on timesheets

Disaster Recovery / Downtime Procedures

IoT Dr. Kim Sleep Study

Recurring

RAD Projects

TBD

Infrastructure & Networking

Project Code Combo Activity PM Parent

ASA VPN Okta to Entra

Linux Research / Server Deployment

Network Diagram Library

iTrack → Jira (Atlassian) Migration

Operational / Administrative

Project Code Combo Activity PM Parent

ISE Policy / General Support

NEEDS CODE — ~3.5 hrs/week

Change Management / CRs

NEEDS CODE — ~6 hrs/week

Admin / Documentation

NEEDS CODE — ~1 hr/week

Meetings & Collaboration

NebulaONE AI Platform

InfoSec Reporting Dashboard

P2 — NOT STARTED

iTrack → Jira Migration

Standard Administrative Codes

Field Value Notes

Account

605010

InfoSec Engineering

Fund Code

1010

Department

84970000

PC Unit

PC100

Activity Hour Baselines

Standard hour estimates per activity type. Use as guidance for consistent time reporting.

ISE / Network Policy

Activity Hours Includes

ISE Policy - MAC Auth

3.0

Endpoint group, authz profile, policy rule, testing

ISE Policy - Windows

4.5

EAP-TLS/PEAP config, GPO, cert enrollment, testing

ISE Policy - Linux

4.0

EAP-TLS config, nmcli, cert enrollment, testing

dACL Design

3.5

ACE design, testing, documentation

Authorization Profile

3.0

Profile creation, VLAN/dACL assignment, testing

Policy Set Design

4.0

Full policy set with rules, conditions, testing

WLAN / Wireless

Activity Hours Includes

SSID Design

4.0

Parameters, auth, onboarding flow, documentation

VLAN/dACL Design

3.5

Segmentation, L3 policy, inter-VLAN access

PSK/iPSK Design

3.0

Credential lifecycle, rotation, scoping

QoS/Multicast Design

3.5

QoS classes, mDNS/Bonjour, streaming

RF Survey

4.0

Site survey, coverage analysis, recommendations

AP Deployment

3.0

Physical install, config, validation

Change Management

Activity Hours Includes

Change Request

3.5

CR draft, scope, rollback, risk, approvals

CR Submission

3.0

ServiceNow entry, evidence, CAB prep

CAB Preparation

2.0

Presentation, Q&A prep, stakeholder alignment

Cutover Execution

4.0

Implementation, verification, evidence capture

Rollback Planning

2.0

Rollback procedures, criteria, testing

Meetings & Collaboration

Activity Hours Includes

Meeting Attendance

1.0

Standard meeting participation

Stakeholder Meeting

1.0

Requirements, decisions, actions

Workshop

2.0

Hands-on session, training, deep-dive

Vendor Call

1.5

TAC case, product discussion, support

Support & Operations

Activity Hours Includes

General Support

2.0

Triage, investigation, resolution

Post-Cutover Support

2.5

Hypercare, monitoring, issue resolution

Incident Response

3.0

Investigation, containment, remediation

Troubleshooting

2.5

Root cause analysis, fix, documentation

Discovery & Documentation

Activity Hours Includes

Discovery

3.0

Requirements, inventory, constraints, risks

Requirements Gathering

2.5

Stakeholder interviews, documentation

Architecture Design

4.0

Solution design, diagrams, review

Documentation

2.0

Runbooks, procedures, knowledge base

Security / Compliance

Activity Hours Includes

Security Review

3.0

Design review, risk assessment

Compliance Audit

4.0

Evidence gathering, remediation

Vulnerability Assessment

3.5

Scan review, prioritization, remediation plan

Risk Assessment

2.5

Risk identification, scoring, mitigation

Agent / Endpoint

Activity Hours Includes

Agent Deployment

3.0

Install, config, validation

Agent Removal

2.5

Uninstall, cleanup, verification

Policy Tuning

3.5

Rule adjustment, testing, documentation

GPO Configuration

3.0

Policy creation, testing, deployment

Time Entry Quick Reference

Daily Entry Workflow

  1. Open PeopleSoft Time & Labor

  2. Select pay period

  3. Enter:

    • Project Code from table above

    • Activity (if required)

    • Hours worked

    • Description (activity performed)

Common Activity Descriptions

Copy-paste ready descriptions for time entries:

Activity Type Description Template

ISE Policy Work

ISE policy design/implementation - [endpoint type] authentication

Meetings

[Project name] - stakeholder meeting/requirements gathering

Change Management

CR preparation/submission/CAB - [project name]

Troubleshooting

[System] troubleshooting - [issue summary]

Documentation

Technical documentation - [deliverable name]

Testing

[System] testing/validation - [test type]

Support

Post-implementation support - [project name]

Timesheets

Timesheet: 2026-06-01 — 2026-06-05

Monday 06-01

Project Code Hours Activity Description

Tube System Upgrade

_

3.0

ISE batch onboard script debugging — fixed 7 var++ bugs + local scope. 15 MACs staged for re-run. iTrack 3528165

Abnormal Security (ESA→EOP)

_

2.0

Policy review prep — EOP cmdlet mapping (5 cmdlets), Jihad spreadsheet review, Tyler migration doc review

ISE Policy / Change Management

_

2.5

CR board prep — Guest ACL Hardening + Anonymous Identity Test. CR document review, lab validation planning

CISSP Study / Admin

_

0.5

Exam scheduling coordination

Total

8.0

Tuesday 06-02

Project Code Hours Activity Description

Change Management

_

2.0

CR Board attendance — Guest ACL Hardening (APPROVED), Anonymous Identity Test (APPROVED). Post-approval coordination

Linux Research / Server Deployment

_

2.0

Linux Remediation kickoff meeting + inventory SQL query development (dc-run-sql)

Abnormal Security (ESA→EOP)

_

2.5

DKIM investigation (PowerShell shows disabled), ESA→EOP policy divergence analysis, d001 deliverable

ISE Annual Cert Renewal

_

1.0

Cert renewal meeting — 52 days to expiry, DigiCert CA, CSR generation prep

Spectrum TV/GetWell iPad Refresh

_

0.5

Android handheld scanners — ISE policy scoping for shared device auth (Argam escalation)

Total

8.0

Wednesday 06-03

Project Code Hours Activity Description

Abnormal Security (ESA→EOP)

_

3.0

ESA mail flow policy divergence — full Five Canons analysis. ESA-Bypass skipping blacklist enforcement. EOP anti-spam BCL/SCL policy review

ISE Annual Cert Renewal

_

1.0

CSR generation commands prepared, d001 config staged

QRadar → Sentinel / Monad

_

1.5

Monad pipeline weekly sync with William Cox — FMC/ISE sources, transform design, jq↔GJSON translation reference

Spectrum TV/GetWell iPad Refresh

_

1.0

Getwell iPads — iPSK onboard 2 devices (4C:B9:10:9F:05:9F, C4:12:34:2D:F3:14)

ISE Policy / General Support

_

1.5

Carry-forward task management, CR implementation scheduling coordination (Guest ACL + Anonymous Identity)

Total

8.0

Thursday 06-04

Project Code Hours Activity Description

QRadar → Sentinel / Monad

_

4.0

Monad API discovery — JWT decode, OpenAPI spec, pipeline CRUD operations, edge constraints. Created ise-lab-v2 filtered pipeline via API

ISE Annual Cert Renewal

_

1.0

TLS cert fingerprint script + runbook created (d001 encrypted)

Centralized rsyslog Server

_

1.0

rsyslog central collector partial created (d001 encrypted)

Abnormal Security (ESA→EOP)

_

1.0

ESA-Bypass investigation continued — policy divergence follow-ups

Admin / PeopleSoft

_

1.0

PeopleSoft codes tracker updated — all 28 active projects audited and mapped

Total

8.0

Friday 06-05

Project Code Hours Activity Description

Abnormal Security (ESA→EOP)

_

2.0

ESA-Bypass policy divergence follow-ups, DKIM investigation continued, AutoForwarding remediation

ISE Policy / General Support

_

2.0

Carry-forward items: Tube System re-run coordination, Alex Pena device verification, Android scanners policy (June 8 deadline)

Change Management

_

1.5

Guest ACL + Anonymous Identity implementation scheduling with Tony Sun, David Rukiza, Argam

Linux Research / Server Deployment

_

1.5

Linux inventory discovery — query refinement, dc-run-sql validation

Documentation / Admin

_

1.0

Worklog triage, task prioritization, PeopleSoft code assignment

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

Abnormal Security (ESA→EOP)

2.0

2.5

3.0

1.0

2.0

10.5

QRadar → Sentinel / Monad

1.5

4.0

5.5

Change Management / CRs

2.5

2.0

1.5

6.0

ISE Annual Cert Renewal

1.0

1.0

1.0

3.0

Tube System Upgrade

3.0

3.0

Linux Research / Remediation

2.0

1.5

3.5

Spectrum/GetWell/Scanners

0.5

1.0

1.5

Centralized rsyslog

1.0

1.0

ISE Policy / General Support

1.5

2.0

3.5

Admin / Documentation

0.5

1.0

1.0

2.5

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-05-25 — 2026-05-29

Monday 05-25

Project Code Hours Activity Description

Holiday

8.0

Memorial Day

Total

8.0

Tuesday 05-26

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

Zebra printer network issue — validated 217 Zebra devices via ISE DataConnect, 14,300 auths with 0 failures. Confirmed ISE auth is not root cause

Abnormal Security (ESA→EOP)

_

4.0

SEG-to-Defender migration — deployed all 5 MDO policy layers (Anti-Spam, Anti-Phish, Anti-Malware, Safe Attachments, Safe Links) via Exchange Online PowerShell. Validated with time-sliced message trace (37k delivered, 146 spam filtered)

Total

8.0

Wednesday 05-27

Project Code Hours Activity Description

Change Management

_

3.0

Two iTrack changes prepared: WIR-M-01 guest ACL hardening (Page Ground switch, Tony Sun + Andrian Ledezma) and WIR-L-01 EAP anonymous identity MDM profiles (Argam Darbindian + Andrian Ledezma). Full rollback commands included

MSCHAPv2 to EAP-TLS Migration

_

3.0

GPO reports v2 — 8-report PowerShell suite: GPO→OU mapping, OU device census, security filtering, stale accounts, link conflicts, inheritance, GPO vs ISE reconciliation, migration readiness matrix

ISE Policy / General Support

_

2.0

chlxisecsftp investigation — 6-phase forensic ownership determination for mystery server 10.101.27.175 (Ben Castillo, 2019 build). SSH forensics, ISE cross-reference, AD/vCenter/CMDB evidence matrix

Total

8.0

Thursday 05-28

Project Code Hours Activity Description

ISE Policy / General Support

_

8.0

General support / admin (no worklog captured)

Total

8.0

Friday 05-29

Project Code Hours Activity Description

ISE Policy / General Support

_

8.0

General support / admin (no worklog captured)

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

Holiday (Memorial Day)

8.0

8.0

ISE Policy / General Support

4.0

2.0

8.0

8.0

22.0

Abnormal Security (ESA→EOP)

4.0

4.0

Change Management

3.0

3.0

MSCHAPv2 to EAP-TLS Migration

3.0

3.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-05-18 — 2026-05-22

Monday 05-18

Project Code Hours Activity Description

QRadar → Sentinel / Monad

_

5.0

ISE→Monad secure syslog integration — extracted Monad TLS cert chain, uploaded CA to ISE Trusted Certificates, configured Remote Logging Target (TCP 6514). Troubleshooting streaming errors in Monad console

QRadar → Sentinel / Monad

_

3.0

Created step-by-step runbook for ISE Remote Logging Target→Monad (cert extraction, ISE import, RLT config, logging categories, validation, troubleshooting). Encrypted as d001 partial

Total

8.0

Tuesday 05-19

Project Code Hours Activity Description

QRadar → Sentinel / Monad

_

4.0

Finalized ISE-to-Monad secure syslog runbook. Restructured as d001 partial for encrypt/decrypt lifecycle. Updated README with ISE→Monad section

Documentation / Admin

_

2.0

Carryover backlog updates — Monad/SIEM entries reflect ISE integration progress. Worklog maintenance

ISE Policy / General Support

_

2.0

General support — task triage, priority alignment

Total

8.0

Wednesday 05-20

Project Code Hours Activity Description

Documentation / Admin

_

4.0

Security audit — encrypted all 231 plaintext .adoc files in d001. Removed gitignore whitelist exceptions. Token rotation identified as TODO

ISE Policy / General Support

_

4.0

General support / admin — PeopleSoft charge code verification, task management

Total

8.0

Thursday 05-21

Project Code Hours Activity Description

Documentation / Admin

_

4.0

Completed d001 encryption — remaining 52 whitelisted plaintext files encrypted. Removed local gitignore overrides. Token rotation TODO carried forward

ISE Policy / General Support

_

4.0

General support / admin

Total

8.0

Friday 05-22

Project Code Hours Activity Description

ISE Policy / General Support

_

8.0

General support / admin (no CHLA-specific worklog detail captured)

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

QRadar → Sentinel / Monad

8.0

4.0

12.0

ISE Policy / General Support

2.0

4.0

4.0

8.0

18.0

Documentation / Admin

2.0

4.0

4.0

10.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-05-11 — 2026-05-15

Monday 05-11

Project Code Hours Activity Description

ISE Policy / General Support

_

8.0

General support / admin (no worklog detail captured)

Total

8.0

Tuesday 05-12

Project Code Hours Activity Description

ISE Policy / General Support

_

8.0

General support / admin (no worklog detail captured)

Total

8.0

Wednesday 05-13

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

4.0

Standard migration report — 5-sheet DataConnect SQL (exec summary, weekly trend, wave breakdown, device detail, stale devices). 6,230 MSCHAPv2 devices, 69.2% progress. VPN/OEAP exclusions applied

Abnormal Security (ESA→EOP)

_

2.0

CAB approval follow-up — implementation scheduled 2026-05-14. Created cab-talking-points partial (elevator pitch, key points, anticipated Q&A)

QRadar → Sentinel / Monad

_

2.0

Overview updated — 3 secrets configured in CHLA tenant. 404 on DCE endpoint confirms path works, DCR not yet created. Blockers: Rule ID + Stream Name pending Victor/Mauricio

Total

8.0

Thursday 05-14

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

8.0

Sheet 6 (Policy Match by Protocol) — new SQL query: policy set x auth rule x auth profile x protocol with device counts. Added to standard report with Excel integration. Cert-based anonymous outer identity validation requirement identified

Total

8.0

Friday 05-15

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

5.0

Report automation — dc-run-sql.sh, build-enhanced-report.py (Catppuccin dashboard), build-full-report.py, device-detail-to-xlsx.py. Runbook created. SQL optimization: 90d→30d window, removed correlated subquery, fixed migration_wave bucketing

MSCHAPv2 to EAP-TLS Migration

_

2.0

d000 validation — all 6 SQL queries tested against home lab ISE 3.2. 5-table JOIN validated (48 cols). Full 6-sheet Excel pipeline end-to-end

Documentation / Admin

_

1.0

Separated concerns: project README (status/ownership), scripts README (tool reference), runbook (procedure)

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

MSCHAPv2 to EAP-TLS Migration

4.0

8.0

7.0

19.0

ISE Policy / General Support

8.0

8.0

16.0

Abnormal Security (ESA→EOP)

2.0

2.0

QRadar → Sentinel / Monad

2.0

2.0

Documentation / Admin

1.0

1.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-05-04 — 2026-05-08

Monday 05-04

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

iTrack #1929634 — CCE Dialysis connectivity (Jeff Begonia, MAC 00:18:7D:D6:69:38). iTrack #3129942 — Arcadia Echo machine (Mark James, wired 00:04:5F:7F:2A:56 + wireless A4:FC:77:4F:0D:73). Investigation prep and ERS/MnT query staging

Firewall Audit

_

2.0

Firewall audit project enhanced — 5 query templates added to fmc-discovery.adoc (prefilter, policy assignments, NAT, EtherChannel, access rules, deployment status). Quick Start runbook created

CISSP Study / Admin

_

1.0

CISSP timeline reset — June 1 → July 12 across 14 files (trackers, portfolio, nav, metadata, education). RHCSA deadline updated June 1 → Q3 2026

ISE Policy / Change Management

_

1.0

Mandiant remediation follow-up. Guest ACL continued validation

Documentation / Admin

_

1.0

Stale adoc audit (14 files updated). pfSense → VyOS corrections in dossier

Total

8.0

Tuesday 05-05

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

INC-2026-05-05-isensix-down — VLAN mismatch root cause. Reassigned via ERS PUT. Fleet audit: 59+ iSensix devices, 14 stragglers identified. Arcadia Echo follow-up — device hitting correct Medical onboard rule

MSCHAPv2 to EAP-TLS Migration

_

2.0

MSCHAPv2 maintenance window active (Will). Coordination and monitoring

Abnormal Security (ESA→EOP)

_

1.0

Abnormal platform continued research. Meeting prep

Documentation / Admin

_

1.0

iTrack ticket updates, general admin

Total

8.0

Wednesday 05-06

Project Code Hours Activity Description

ISE Policy / General Support

_

2.0

INC-2026-05-06-wireless-multi-device — Vocera/WYSE/neuro physicians (Duque Ground) emergency. ISE ruled out (zero RADIUS failures). Root cause: AP roaming/flapping. VP briefed with Grafana dashboard

MSCHAPv2 to EAP-TLS Migration

_

2.0

Protocol distribution report: 6,227 MSCHAPv2 devices, 14,249 EAP-TLS/TEAP (70% migrated). Per-wave platform guides built (Chromebooks, WYSE, Windows, macOS, iOS)

Abnormal Security (ESA→EOP)

_

1.5

Working session with Will Cox, Vanessa Ahn, Alex Mejia, vendor team. Architecture documented: MDO primary, Abnormal secondary. CR assigned for read/write permissions (CAB May 13)

QRadar → Sentinel / Monad

_

1.0

Monad vendor working session. siem-migration-playbook.adoc with D2 diagrams and meeting notes

ISE Policy / Change Management

_

1.0

Mandiant ACL remediation team doc — guest ACL lockdown. Renamed Guest-CWA-Redirect-v2. SMB 445 host validation queries

Linux Research / Server Deployment

_

0.5

Linux EAP-TLS deployment guide renamed. Team partials reorganized. CVE inventory moved to investigations

Total

8.0

Thursday 05-07

Project Code Hours Activity Description

BMS Device Inventory

_

2.0

7 VFD devices reassigned to IoT_Onboard. Built ise-batch-onboard.sh — reusable batch endpoint group assignment (mac-file, group-name, description). Lab tested on d000

ISE Policy / General Support

_

2.5

INC-2026-05-07 Duque Ground physician connectivity (C-level escalation) — Dr Agers + Dr Joshi, 4 devices. Zero RADIUS failures. KDC cert EKU issue identified. Netlogon 5719 errors (hospital-wide DC reachability). C-level evidence response drafted

QRadar → Sentinel / Monad

_

1.5

Monad pipeline Sentinel output deployment — 4 technical partials (overview, Azure prereqs, config, validation). 3 blockers documented: Azure private network, tenant console error, DCR not created. Email draft to Monad vendor

Abnormal Security (ESA→EOP)

_

1.5

CR-2026-05-07-abnormal-read-write drafted — iTrack fields, 4 implementation phases, backout options, 5 testing sections. CAB May 13, implementation May 14. Jason Landeros implementer

Documentation / Admin

_

0.5

Tracker updates (9 files), investigation naming convention standardized

Total

8.0

Friday 05-08

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

CVE-2026-43284/CVE-2026-43500 (Dirty Frag) — kernel LPE investigation. Proved module autoload without privileges. Antora incident (4 partials). d001 enterprise assessment, CHLA mitigation plan, advisory, tracking matrix. WSL2 unpatched (6.18.26 vs required 6.18.28)

ISE Policy / General Support

_

1.5

Dirty Frag continued — applied blocklist mitigation, fixed false-sense-of-security in status check (4-state verdict). Enterprise advisory distributed

MSCHAPv2 to EAP-TLS Migration

_

1.0

MSCHAPv2 maintenance window monitoring. Will coordination

Abnormal Security (ESA→EOP)

_

1.0

Abnormal CR follow-up — CAB preparation for May 13

Documentation / Admin

_

0.5

Worklog updates, codex entries (lsof SSH session management, xargs/kill patterns)

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

3.0

4.0

2.0

2.5

5.5

17.0

MSCHAPv2 to EAP-TLS Migration

2.0

2.0

1.0

5.0

Abnormal Security (ESA→EOP)

1.0

1.5

1.5

1.0

5.0

QRadar → Sentinel / Monad

1.0

1.5

2.5

BMS Device Inventory

2.0

2.0

Firewall Audit

2.0

2.0

ISE Policy / Change Management

1.0

1.0

2.0

CISSP Study / Admin

1.0

1.0

Linux Research / Server Deployment

0.5

0.5

Documentation / Admin

1.0

1.0

0.5

0.5

3.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-04-27 — 2026-05-01

Monday 04-27

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

Endpoint disconnect investigation scaffold for Rhey Aquino — F8:75:A4:F3:61:25 (d-mj0dntn2). Built full investigation structure: ERS lookup, MnT session, MnT auth history, DataConnect flapping query partials

MSCHAPv2 to EAP-TLS Migration

_

1.5

MSCHAPv2 migration prep — Will’s maintenance window opens 5/4. Pre-work planning and coordination

Abnormal Security (ESA→EOP)

_

1.0

Abnormal Security platform research continued

Documentation / Admin

_

1.5

Build toolchain portability verification (domus-asciidoc-build for work WSL). Commit prep and staging for encrypted investigation files

Total

8.0

Tuesday 04-28

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

Rhey Aquino endpoint disconnect — pulled, decrypted, ran ERS/MnT/DataConnect queries against F8:75:A4:F3:61:25. Findings partial updated. Teams response

ISE Policy / General Support

_

1.5

Philips device onboard verification — D4:A2:CD:9D:13:3A confirmed authenticated to Medical_Onboard

Abnormal Security (ESA→EOP)

_

1.0

Dashboard review, meeting notes follow-up

ASA VPN Okta to Entra

_

1.0

VPN split tunnel — Jenny’s response drafted, follow-up questions addressed

MSCHAPv2 to EAP-TLS Migration

_

1.0

Maintenance window prep — Will’s window 5/4. Pre-staging and coordination

Documentation / Admin

_

0.5

PeopleSoft time tracking

Total

8.0

Wednesday 04-29

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

ISE advisory CVSS 9.9 follow-up. Strongline Gateway VLAN coordination (38 days). k3s NAT verification (46 days)

MSCHAPv2 to EAP-TLS Migration

_

2.0

Wednesday cadence call. Action-item tracker updates per workstream

QRadar → Sentinel / Monad

_

1.5

Monad pipeline evaluation continued. Sentinel connector mapping follow-up

Linux Research / Server Deployment

_

1.0

Linux research continued (CISO priority). Enterprise Linux 802.1X follow-up

Documentation / Admin

_

0.5

iTrack ticket triage

Total

8.0

Thursday 04-30

Project Code Hours Activity Description

ISE Policy / General Support

_

2.5

JAMF cert subject change investigation (Drew Kaurloto) — validated EMAIL→emailAddress change has zero ISE impact. All cert auth profiles use SUBJECT_COMMON_NAME via ERS API

QRadar → Sentinel / Monad

_

2.0

Monad pipeline evaluation continued. SIEM migration workstream coordination

ISE Policy / Change Management

_

1.5

Mandiant remediation — Guest ACL lab validation. Q2 2026 assessment prep

Abnormal Security (ESA→EOP)

_

1.0

Abnormal Security project scaffolded. Session notes structure established

Documentation / Admin

_

1.0

Worklog system improvements — make new-month (May scaffolded), month rollover automation. Stub detection in audit

Total

8.0

Friday 05-01

Project Code Hours Activity Description

ISE Policy / General Support

_

2.5

CVE-2026-31431 (Copy Fail) organizational response — detection script, mitigation proof document, testing across WSL2 (Arch/Fedora/Oracle Linux), RHEL built-in kernel discovery. David Ntashamaje MDE KQL identified 29 WSL devices

ISE Policy / General Support

_

2.0

Endpoint D-N45577 GPO resolution — root cause: device in wrong OU pushing PEAP instead of TEAP. Moved to Win11 OU, TEAP EAP-TLS working with user+machine chaining

ISE Policy / General Support

_

1.0

JAMF cert subject change (Drew Kaurloto) — ISE cert auth profiles validated, zero impact confirmed via ERS API

Abnormal Security (ESA→EOP)

_

1.0

First Abnormal Security working session. Investigation scaffolded, README updated

MSCHAPv2 to EAP-TLS Migration

_

1.0

MSCHAPv2 migration prep — 3 days to maintenance window. Coordination with Will

Documentation / Admin

_

0.5

Build error fixes (28 xref errors), stale tracker refresh

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

4.0

4.5

3.0

2.5

5.5

19.5

MSCHAPv2 to EAP-TLS Migration

1.5

1.0

2.0

1.0

5.5

Abnormal Security (ESA→EOP)

1.0

1.0

1.0

1.0

4.0

QRadar → Sentinel / Monad

1.5

2.0

3.5

ASA VPN Okta to Entra

1.0

1.0

ISE Policy / Change Management

1.5

1.5

Linux Research / Server Deployment

1.0

1.0

Documentation / Admin

1.5

0.5

0.5

1.0

0.5

4.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-04-20 — 2026-04-24

Monday 04-20

Project Code Hours Activity Description

QRadar → Sentinel / Monad

_

4.0

Streamlined QRadar guide finalized (2 commits). SIEM migration report generated — xlsx, csv, json deliverables under d001. LogSource/offense/volume/window data collected

ISE Policy / General Support

_

1.5

CAB prep for SRT Research VLAN 233 (CHLA-Research) — talking points, scope, risk, rollback, test plan

Linux Research / Server Deployment

_

1.0

Data forensics toolchain installed (poppler, tesseract, imagemagick, exiftool, binwalk, testdisk, hashdeep). Local AI image analysis tested (minicpm-v via Ollama)

MSCHAPv2 to EAP-TLS Migration

_

1.0

Scheduled recurring Wednesday cadence call. Drafted invite list (8 stakeholders). Netapi endpoint report planning

Documentation / Admin

_

0.5

Mandiant remediation prep — Excel findings from 4/16, Guest ACL lab validation planning

Total

8.0

Tuesday 04-21

Project Code Hours Activity Description

Change Management

_

2.0

CAB presentation at 15:00 — SRT Research VLAN 233 extension to 9 SRT access floors + distribution rename. APPROVED. Tony Sun implementor, Evan presenter/tester

ISE Policy / General Support

_

3.0

PRJ-downtime-computers ISE DataConnect wireless audit — built dc_query helper (Python + oracledb), v2 query (identity_group/endpoint_profile/authorization_rule). Results: 45 computers, 16 violating wireless, 29 compliant wired-only. Report v3 delivered to management

QRadar → Sentinel / Monad

_

1.0

SIEM migration report ready for stakeholder presentation. Connector mapping next step. Monad evaluation continued (43 days lead role)

MSCHAPv2 to EAP-TLS Migration

_

1.0

Scheduled recurring Wednesday cadence — invite list finalized (Tony Martinez, Mark Silva, Argam, Drew, Andrew, Jason, Victor, Justin). Action-item tracker build started

Documentation / Admin

_

1.0

GitHub API cross-repo activity audit (12 repos, 181 commits). Fixed git identity split in dots-quantum. ISE advisory CVSS 9.9 Patch 10 status check

Total

8.0

Wednesday 04-22

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

3.0

First recurring Wednesday cadence call. Presented netapi endpoint report (6,084 devices, 29 device types). Built action-item tracker per workstream (8 platforms)

QRadar → Sentinel / Monad

_

2.0

LogSourceType-to-Sentinel connector mapping. Monad pipeline evaluation continued (44 days)

ISE Policy / General Support

_

1.5

ISE advisory CVSS 9.9 Patch 10 check. ISE admin MFA enforcement recommendation. Dr. Kim iPSK device follow-up

ISE Policy / Change Management

_

1.0

Mandiant remediation — 4/16 findings Excel update. Guest ACL lab validation (GUEST_CWA_REDIRECT_MAX_SECURITY)

Documentation / Admin

_

0.5

PeopleSoft time tracking, iTrack ticket triage

Total

8.0

Thursday 04-23

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

P0 task backlog audit — identified 45-day-old blockers (k3s NAT, Wazuh indexer). Disaster Recovery scoping. Linux Research follow-up (CISO priority)

QRadar → Sentinel / Monad

_

2.0

Monad evaluation continued. Sentinel KQL proficiency development

Documentation / Admin

_

2.0

Landing page automation — added current-day/current-date/current-worklog attributes to antora.yml. Created make update-today-attrs target

ISE Policy / Change Management

_

1.0

Mandiant Q2 2026 assessment prep. Guest ACL lab follow-up

Total

8.0

Friday 04-24

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

ISE advisory tracking (CVSS 9.9). k3s NAT verification follow-up (44 days). Strongline Gateway VLAN follow-up (37 days). Enterprise Linux 802.1X standardization

Linux Research / Server Deployment

_

2.0

Linux research continued (CISO priority, behind schedule). Shahab/Ding deployment standardization

Abnormal Security (ESA→EOP)

_

1.5

Initial research on AI platform. ESA cutover timeline review

DMZ Migration

_

1.0

External services audit behind NetScaler — initial scoping

Documentation / Admin

_

0.5

iTrack ticket closure, PeopleSoft admin

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

QRadar → Sentinel / Monad

4.0

1.0

2.0

2.0

9.0

ISE Policy / General Support

1.5

3.0

1.5

3.0

3.0

12.0

MSCHAPv2 to EAP-TLS Migration

1.0

1.0

3.0

5.0

Change Management

2.0

2.0

ISE Policy / Change Management

1.0

1.0

2.0

Linux Research / Server Deployment

1.0

2.0

3.0

Abnormal Security (ESA→EOP)

1.5

1.5

DMZ Migration

1.0

1.0

Documentation / Admin

0.5

1.0

0.5

2.0

0.5

4.5

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-04-13 — 2026-04-17

Monday 04-13

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

P1 infrastructure incident — dual KVM hypervisor outage recovery. kvm-02 restored (6 VMs), bridge VLAN PVID mismatch corrected, NAS fstab hardened. kvm-01 fiber CRC errors on Te1/0/2, moved to Te1/0/8, 8 VMs started

Meetings

_

3.0

Onsite security team meeting — 5 workstreams: Abnormal Security ESA migration, Microsoft Defender MDE onboarding, Sentinel KQL library, Monad syslog level strategy (RFC 5424), Firewall/DMZ inventory. 12 action items assigned

Abnormal Security (ESA→EOP)

_

1.0

ESA migration timeline discussion, quarantine alignment, rollback plan review (from meeting)

QRadar → Sentinel / Monad

_

1.0

Monad pipeline — approved syslog level 6 source list defined, detection gap analysis discussed (from meeting)

Total

8.0

Tuesday 04-14

Project Code Hours Activity Description

Abnormal Security (ESA→EOP)

_

2.5

Meeting notes consolidation — Defender docs Linux toolchain organized, email policy search patterns, KQL query extraction patterns across security domains

ISE Policy / General Support

_

2.0

Morning WiFi diagnostics (CHLA-Remote profile verification, adapter enumeration, BSSID scanning). Infrastructure carryover from KVM incident

Change Management

_

1.5

CR-2026-04-15 SRT VLAN — iTrack submission preparation (due tomorrow)

Documentation / Admin

_

2.0

PowerShell codex — network diagnostics (WiFi profiles, adapter enumeration, WLAN discovery, service enumeration). PowerShell→JSON→jq bridge patterns

Total

8.0

Wednesday 04-15

Project Code Hours Activity Description

Change Management

_

2.5

CR-2026-04-15 SRT Research VLAN — pre-change baseline captured and age-encrypted (access switch, Nexus distribution, ISE config). Change window execution

Abnormal Security (ESA→EOP)

_

2.0

Abnormal Security read-only O365/email integration completed during morning meeting. ESA migration upgraded to active evaluation phase

ISE Policy / General Support

_

2.0

ISE ERS/MnT/DataConnect API lab testing — endpoint CRUD, session queries, SQL queries via oracledb. Key discoveries: MnT XML responses, MAC-only reliable key, CoA target is NAS IP

ISE Policy / General Support

_

1.5

ISE endpoint group flapping incident (INC-2026-04-15) — IoT devices reverting from iPSK to GuestEndpoints. Root cause: MAB fallback overrides staticGroupAssignment. ERS API remediation

Total

8.0

Thursday 04-16

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

FMC REST API deep dive — live API calls against FMC, 8 FTDs enumerated across 3 datacenters, NetScaler DMZ zones discovered, Perimeter ACP confirmed empty. 25+ function ops script created

Mandiant Remediation

_

2.0

Mandiant guest ACL feedback preparation, SIEM report reproduction, findings documentation

ISE Policy / General Support

_

1.5

ISE endpoint flapping follow-up (INC-2026-04-16) — 2 endpoints reassigned via ERS API (DELETE+POST and PUT methods). PUT vs DELETE+POST pattern documented

Documentation / Admin

_

1.5

14 encrypted project data directories under d001/projects/ — new security standard for sensitive artifacts. Codex updates: age encryption, xargs+git pipelines

Total

8.0

Friday 04-17

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

2.5

MSCHAPv2 10:30 meeting — platform ownership matrix captured (8 platforms: GPOs, SCCM, Workspace ONE, Intune, JAMF, Vocera, Chrome, Wyse). Weekly Wednesday cadence call to schedule

ISE Policy / General Support

_

2.0

ISE DataConnect deep dive — multi-table SQL joins (auth methods, identity groups, RADIUS, profiler data). 10,387-line examples file. ISE analytics domain-agnostic reference created

Change Management

_

1.5

CR-2026-04-15 SRT VLAN submitted to iTrack. CAB presentation scheduled for 4/21 15:00. Architecture diagram and change plan finalized

ISE Hardware Refresh

_

1.0

ISE disaster recovery project scaffolded (P0) — DR priority ranking: ISE > Firewalls > Core switches > WLCs > DNS > SIEM. Node roles, critical-auth VLAN, restore procedures

QRadar → Sentinel / Monad

_

1.0

QRadar analysis runbook streamlined, QRadar-to-Sentinel collection updated. AQL query URL encoding techniques documented

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

3.0

2.0

3.5

4.5

2.0

15.0

Abnormal Security (ESA→EOP)

1.0

2.5

2.0

5.5

Change Management

1.5

2.5

1.5

5.5

Meetings

3.0

3.0

MSCHAPv2 to EAP-TLS Migration

2.5

2.5

Mandiant Remediation

2.0

2.0

QRadar → Sentinel / Monad

1.0

1.0

2.0

Documentation / Admin

2.0

1.5

3.5

ISE Hardware Refresh

1.0

1.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-04-06 — 2026-04-10

Monday 04-06

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

Standards framework — 20 RFC 2119 standards across 5 domains (Operations, Documentation, Security, AI, Workflow). Quality audit 400/400 criteria

Mandiant Remediation

_

2.0

Mandiant security remediation project — January pentest findings consolidated, evil twin ACL design, CVE-2026-20029 ISE XXE patching, dACL enforcement workstream

QRadar → Sentinel / Monad

_

1.5

QRadar → Sentinel restructure — converted to full project standard, 5 new partials, metadata/summary/overview

Documentation / Admin

_

1.5

16 spoke repo conversions to project standard, certification restructure, project management tooling

Total

8.0

Tuesday 04-07

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

General support — carry-forward item triage, ISE patch status verification, project portfolio review

Documentation / Admin

_

2.0

Work priorities documentation, repo synchronization, deployment verification

Meetings

_

2.0

Team coordination, project status updates

Total

8.0

Wednesday 04-08

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

General support — MSCHAPv2 migration planning continuation, endpoint report tooling preparation

Abnormal Security (ESA→EOP)

_

2.0

ESA → Abnormal Security evaluation — integration model research, cutover timeline assessment

Documentation / Admin

_

2.0

Work project tracking, blocker dashboard updates, certification progress tracking

Total

8.0

Thursday 04-09

Project Code Hours Activity Description

Meetings

_

3.0

Manager 1:1 with Sarah Clizer — 8 project status review (Mandiant P0, Linux Research P0, iPSK Manager P0, MSCHAPv2 P0, CHLA Antora P1, SIEM Migration P1, ISE 3.4 P1, ISE HW Refresh P1)

Mandiant Remediation

_

2.0

Mandiant Q2 assessment timeline discussion, dACL enforcement status, posture/ACL remediation planning

MSCHAPv2 to EAP-TLS Migration

_

1.5

Migration planning review — resource allocation discussion, Chromebook + Wyse wave scoping

ISE Policy / General Support

_

1.5

ISE patch verification, k3s NAT blocker review (31 days), Wazuh indexer recovery status

Total

8.0

Friday 04-10

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

ISE codex restructure — promoted 7 POSIX tools to top-level categories, created 6 new tool codexes, updated STD-016. Operational reference material for ISE troubleshooting

Documentation / Admin

_

2.0

Build error fixes — unescaped pipes in tables, attribute warnings, 19 broken xref references after directory rename

QRadar → Sentinel / Monad

_

1.5

jq infrastructure queries (7 levels) — progressive examples from select() to multi-source joins for SIEM data processing

Linux Research / Server Deployment

_

1.5

Python dashboard suite — system inventory DataFrames (906 packages, 118 services, network interfaces, routes, ports). Infrastructure visibility tooling

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

3.0

4.0

4.0

1.5

3.0

15.5

Documentation / Admin

1.5

2.0

2.0

2.0

7.5

Mandiant Remediation

2.0

2.0

4.0

QRadar → Sentinel / Monad

1.5

1.5

3.0

Meetings

2.0

3.0

5.0

Abnormal Security (ESA→EOP)

2.0

2.0

MSCHAPv2 to EAP-TLS Migration

1.5

1.5

Linux Research / Server Deployment

1.5

1.5

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-03-30 — 2026-04-03

Monday 03-30

Project Code Hours Activity Description

Documentation / Admin

_

5.0

domus-captures cleanup — orphan page removal, template library (16 templates), nav structure repair, build warning triage

ISE Policy / General Support

_

3.0

ISE documentation review, Antora build verification, deployment fix (domus-docs playbook correction)

Total

8.0

Tuesday 03-31

Project Code Hours Activity Description

Documentation / Admin

_

5.0

Documentation tooling — Ollama API doc endpoints (markdown converter, linter, session-to-worklog, summarizer), system maintenance

ISE Policy / General Support

_

3.0

ISE documentation infrastructure review, project tracking updates, carry-forward item triage

Total

8.0

Wednesday 04-01

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

2.5

Team meeting — leadership requesting netapi endpoint reports with pandas graphs, migration wave identification (Chromebooks + Wyse = ~2,000 endpoints)

QRadar → Sentinel / Monad

_

2.0

Microsoft Sentinel onboarding — Azure portal access, first KQL queries, log source schema review. QRadar migration lead role confirmed

ISE Policy / General Support

_

1.5

Vocera/Wyse iTrack RCA — TAC found RabbitMQ CPU spike on primary MnT, no definitive root cause. Endpoint mitigation via onboard identity group

Abnormal Security (ESA→EOP)

_

1.0

New project assigned — ESA → Abnormal Security API migration. Initial scope assessment

Linux Research / Server Deployment

_

1.0

Enterprise Linux 802.1X standardization — CISO concern about central management, DACL/VLAN assignment gaps

Total

8.0

Thursday 04-02

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

netapi ERS client modularization — split 5,091-line monolith into 15 mixin files, 113+ methods, Sphinx/Furo API docs for team review

ISE Policy / General Support

_

2.0

GCC ISE engagement — 3/4 nodes restored (password recovery + cert verification), PSN-04 deferred. TAC-2026-04-gcc-ise-cert-import documented

Abnormal Security (ESA→EOP)

_

1.5

PRJ-abnormal-security scaffolded — Cisco ESA → Abnormal API migration project scope and timeline

Azure Legacy Migration

_

1.5

PRJ-dmz-migration — external services audit behind NetScaler, DMZ assessment scoping

Total

8.0

Friday 04-03

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

Codex system buildout — 204 production-grade code snippets across 18 domains (bash, python, powershell, networking, security). ISE operational reference material

Documentation / Admin

_

2.0

Project tracking, carry-forward triage, work priorities documentation

MSCHAPv2 to EAP-TLS Migration

_

2.0

Migration planning — endpoint report preparation, pandas graph requirements scoping

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

3.0

3.0

1.5

5.0

4.0

16.5

Documentation / Admin

5.0

5.0

2.0

12.0

MSCHAPv2 to EAP-TLS Migration

2.5

2.0

4.5

QRadar → Sentinel / Monad

2.0

2.0

Abnormal Security (ESA→EOP)

1.0

1.5

2.5

Linux Research / Server Deployment

1.0

1.0

Azure Legacy Migration

1.5

1.5

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-03-23 — 2026-03-27

Monday 03-23

Project Code Hours Activity Description

Documentation / Admin

_

4.0

Sustainable worklog system implementation — 7 section partials + 3 checkbox partials, modular architecture reducing daily worklogs from ~300 to ~50 lines

ISE Policy / General Support

_

3.0

Carry-forward backlog — Strongline Gateway status, k3s NAT verification, Wazuh indexer, Monad pipeline evaluation coordination

QRadar → Sentinel / Monad

_

1.0

Monad evaluation — continued pipeline testing and input source validation

Total

8.0

Tuesday 03-24

Project Code Hours Activity Description

Documentation / Admin

_

4.0

AsciiDoc mentoring session — kramdoc (markdown→AsciiDoc) conversion, document structure, cross-references, Antora integration basics

ISE Policy / General Support

_

2.0

Carry-forward professional backlog review, ISE TAC case monitoring (S2 post-reboot), task prioritization

QRadar → Sentinel / Monad

_

2.0

Claude Code Features project — data pipeline YAML architecture (92 projects, 8 categories), automation planning for Monad integration

Total

8.0

Wednesday 03-25

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

Carry-forward backlog — Strongline Gateway verification, ISE TAC case S2 monitoring, Vocera EAP-TLS follow-up, pending ISE Patch 9 coordination

Documentation / Admin

_

2.0

AsciiDoc mentoring carryover topics — document structure, tables, code blocks, cross-references

Change Management

_

2.0

CR documentation — dots-quantum tmux package change request, stow compatibility audit methodology (applicable to CHLA config management)

Total

8.0

Thursday 03-26

Project Code Hours Activity Description

ISE Policy / General Support

_

3.0

netapi security hardening — patched 4 Dependabot vulnerabilities (cryptography, pyasn1, requests, python-socketio), unified exception hierarchy

QRadar → Sentinel / Monad

_

2.0

netapi test infrastructure — pytest fixtures, 18 ISE ERS unit tests, mock API responses, 22% coverage on ERS client

Documentation / Admin

_

2.0

Carry-forward backlog review (8 items, 9-16 days carried), AsciiDoc mentoring topics remaining, work priority assessment

ISE Policy / Change Management

_

1.0

Nav-explore enhancement planning — antora.yml attribute requirements for 16 components, blocked item documentation

Total

8.0

Friday 03-27

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

Carry-forward backlog — ISE TAC case S2 monitoring, Strongline Gateway verification, Monad pipeline status, Wazuh indexer recovery coordination

Documentation / Admin

_

2.0

Shell Scripting Guide structure — 23 chapter study templates, combined study plan for Linux Bible + Shell Scripting Guide, AsciiDoc grep patterns reference

CISSP Study / Admin

_

2.0

DELE C1 Spanish lesson prep and session — subjunctive clauses, discourse connectors, essay structure review (cross-training communication skills)

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

3.0

2.0

4.0

3.0

4.0

16.0

Documentation / Admin

4.0

4.0

2.0

2.0

2.0

14.0

QRadar → Sentinel / Monad

1.0

2.0

2.0

5.0

Change Management

2.0

1.0

3.0

CISSP Study / Admin

2.0

2.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-03-16 — 2026-03-20

Monday 03-16

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

ISE incident prep — stakeholder defense points for CISO/leadership (Sarah Clizer, Jonathan Carr, Albert Rodriguez), TAC case S2 status, PSN auth validation

ISE Policy / Change Management

_

2.0

Strongline Gateway VLAN remediation — 8 devices in wrong ISE identity group, CSV import misassignment, incident documentation (INC-2026-03-16)

QRadar → Sentinel / Monad

_

1.0

Monad Pipeline evaluation prep — quick diagnostic commands, pipeline input source research

Documentation / Admin

_

1.0

Comprehensive backlog audit — 8 professional tasks catalogued with days-carried metrics, regex drill system completion

Total

8.0

Tuesday 03-17

Project Code Hours Activity Description

ISE Policy / Change Management

_

3.0

Strongline Gateway VLAN fix (blocking Arin) — identity group reassignment for 8 devices, ISE endpoint verification

ISE Policy / General Support

_

2.0

k3s NAT verification (8 days carried) — NAT rule 170 for 10.42.0.0/16 pod network, Wazuh indexer recovery coordination

QRadar → Sentinel / Monad

_

2.0

Monad Pipeline evaluation (6 days carried) — pipeline creation testing, input source validation

Documentation / Admin

_

1.0

PeopleSoft time entry system creation — project codes table, activity baselines, biweekly tracking template

Total

8.0

Wednesday 03-18

Project Code Hours Activity Description

Documentation / Admin

_

3.0

PeopleSoft time entry (CRITICAL) — scalable time tracking system, 4 project codes mapped (Recognition Kiosk, Spectrum/GetWell, Secure Endpoint, Win11 Hardening)

ISE Policy / Change Management

_

2.0

Strongline Gateway VLAN — continued remediation, ISE endpoint group verification, Arin coordination

ISE Policy / General Support

_

2.0

k3s NAT verification (9 days), Wazuh indexer recovery coordination, carry-forward task triage

QRadar → Sentinel / Monad

_

1.0

Monad quick start — pipeline listing, input source search for Cisco integrations

Total

8.0

Thursday 03-19

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

Carry-forward backlog attack — Strongline Gateway follow-up, k3s NAT verification (10 days), Wazuh recovery coordination

QRadar → Sentinel / Monad

_

2.0

Monad Pipeline evaluation (8 days carried) — continued pipeline creation testing, input/output configuration

Documentation / Admin

_

2.0

Professional backlog audit, PeopleSoft time reconciliation, task prioritization review

Total

8.0

Friday 03-20

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

Carry-forward items — Strongline Gateway VLAN verification (4 days), k3s NAT verification (11 days), Wazuh indexer status check

QRadar → Sentinel / Monad

_

2.0

Monad Pipeline evaluation (9 days) — continued testing, pipeline management commands

Documentation / Admin

_

2.0

Backlog review, carry-forward item documentation, work priority reassessment

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

4.0

2.0

2.0

4.0

4.0

16.0

ISE Policy / Change Management

2.0

3.0

2.0

7.0

QRadar → Sentinel / Monad

1.0

2.0

1.0

2.0

2.0

8.0

Documentation / Admin

1.0

1.0

3.0

2.0

2.0

9.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0


Timesheet: 2026-03-09 — 2026-03-13

Monday 03-09

Project Code Hours Activity Description

ISE Policy / General Support

_

5.0

ISE deployment review, VyOS zone-based firewall architecture study (cross-platform NAC knowledge), NAT rule analysis for pod networking

QRadar → Sentinel / Monad

_

2.0

Monad pipeline evaluation prep — research input sources, transform architecture, pipeline management

Documentation / Admin

_

1.0

Open-source NAC alternatives research (PacketFence, FreeRADIUS) — ISE feature gap analysis

Total

8.0

Tuesday 03-10

Project Code Hours Activity Description

ISE Policy / General Support

_

8.0

General support, carried-over task review, Vault HA failover verification, vault-backup SELinux fix, vault-ssh-sign HA update

Total

8.0

Wednesday 03-11

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

3.0

Vocera EAP-TLS supplicant fix — ~10 phones failing 802.1X, MAC lookup queries, ISE DataConnect auth history, bulk CoA reauth prep

QRadar → Sentinel / Monad

_

2.0

Monad CLI enhancement — 7 new commands (input-create, quick-pipeline, graph, health, clone, watch, inputs --type filter)

ISE Policy / General Support

_

2.0

ISE TAC case prep expansion — certificate diagnostics, time-based analysis, VLAN analysis, security analysis, EAP method analysis (+1192 lines)

Documentation / Admin

_

1.0

netapi git forge CLI integration (GitHub/GitLab/Gitea) — 65 commands with -f json support for automation

Total

8.0

Thursday 03-12

Project Code Hours Activity Description

ISE Policy / General Support

_

4.0

CHLA ISE TAC Case S1 — ~500 endpoints failing 802.1X, Primary MNT RabbitMQ at 109% CPU, node reboot, post-reboot validation, ECCRB submission

MSCHAPv2 to EAP-TLS Migration

_

2.0

EAP-TLS chain fix investigation — client cert missing intermediate CA, ISE error 5411/12935 analysis, cert chain validation

Documentation / Admin

_

1.0

TAC case documentation — D2 deployment diagram, MNT diagnostics added to ise-tac-case-prep.adoc

ISE Policy / General Support

_

1.0

Security hardening audit — exposed Docker ports (Redis 6379, PostgreSQL 5432), rpcbind on 0.0.0.0:111 identified and fixed

Total

8.0

Friday 03-13

Project Code Hours Activity Description

MSCHAPv2 to EAP-TLS Migration

_

4.0

WiFi DHCP failure RCA — root cause identified: IP conflict + MAC randomization breaking ISE session tracking. RCA-2026-03-13-001 created

ISE Policy / General Support

_

2.0

WPA2-PSK fallback connection documented for EAP-TLS infrastructure outages, nmcli reference section created

Documentation / Admin

_

2.0

First RCA document using case-studies template, backlog audit and carryover triage

Total

8.0

Weekly Summary by Project

Project Mon Tue Wed Thu Fri Total

ISE Policy / General Support

5.0

8.0

2.0

5.0

2.0

22.0

MSCHAPv2 to EAP-TLS Migration

3.0

2.0

4.0

9.0

QRadar → Sentinel / Monad

2.0

2.0

4.0

Documentation / Admin

1.0

1.0

1.0

2.0

5.0

Daily Total

8.0

8.0

8.0

8.0

8.0

40.0