CR-2026-03-23 reMarkable Domus Structure Migration — Verification
Pre-Change Verification
| Check | Status |
|---|---|
rmapi configured and authenticated |
[ ] |
Cloud connectivity verified |
[ ] |
Existing folder structure documented |
[ ] |
weasyprint installed |
[ ] |
Python 3.6+ available |
[ ] |
Post-Change Verification
Functionality Tests
-
rmapi lsshows clean root structure (Domus, Legacy, trash) -
rmapi ls "Domus"shows 7 top-level folders -
Spanish content accessible at Domus/Education/Languages/Español (15 items)
-
Work projects at Domus/Projects/Work (9 items)
-
WRKLOG-2026-Summary.pdf uploaded successfully (12 pages)
-
WRKLOG-2026-Full.pdf uploaded successfully (1,095+ pages)
-
PDF opens correctly on reMarkable after sync
-
Handwriting works on all page types
State Comparison
[d] Domus
[d] Legacy
[d] trash
Domus/
├── Education/
│ ├── Certifications/
│ ├── Languages/
│ │ ├── Español/ # 15 items (DELE, Gramática, Literatura, etc.)
│ │ └── English/
│ ├── Literature/ # Epitetos, Figuras Retóricas
│ ├── Mathematics/
│ ├── Music/
│ └── Training/
├── Objectives/ # ← Metas Personales
├── Patterns/
├── Projects/
│ ├── Personal/ # 4 items
│ └── Work/ # 9 items (MSCHAPv2, Intune, etc.)
├── Reading/
│ ├── Articles/ # Periodísticos + Tecnológicos
│ └── Books/ # Libros
├── Reference/ # IA, Sitios web
└── Worklogs/
├── 2025/
└── 2026/
├── WRKLOG-2026-Full # Full year daily planner (1,095 pages)
└── WRKLOG-2026-Summary # Summary of existing worklogs (12 pages)
Parity with domus-captures
| domus-captures | reMarkable |
|---|---|
pages/2025/, pages/2026/ |
Domus/Worklogs/2025/, 2026/ |
pages/education/ |
Domus/Education/ |
pages/projects/ |
Domus/Projects/ |
pages/objectives/ |
Domus/Objectives/ |
pages/patterns/ |
Domus/Patterns/ |
pages/reference/ |
Domus/Reference/ |
WRKLOG-YYYY-MM-DD.adoc (digital) |
WRKLOG-YYYY-Full.pdf (handwritten companion) |
| Check | Status |
|---|---|
Root structure shows Domus, Legacy, trash only |
[x] |
All 7 top-level Domus folders present |
[x] |
Spanish content migrated (15 items) |
[x] |
Work projects migrated (9 items) |
[x] |
Summary PDF uploaded and opens correctly |
[x] |
Full year PDF uploaded and opens correctly |
[x] |
Handwriting works on all page types |
[x] |
Structure mirrors domus-captures hierarchy |
[x] |