Project Codes
Active Projects — With Codes
| Project | Code | Combo | Activity | PM | Parent |
|---|---|---|---|---|---|
Recognition Kiosk (Poppulo) - IS Labor |
000018166 |
000018623 |
20 |
||
Spectrum TV/GetWell iPad Refresh |
000016444 |
000018551 |
20 |
||
Azure Legacy Migration |
000018100 |
000018619 |
20 |
||
Cisco Secure Endpoint Replacement |
000017633 |
000018546 |
|||
Windows 11 Device Hardening |
000017706 |
000018549 |
|||
MSCHAPv2 to EAP-TLS Migration |
000018420 |
Will Cox |
|||
IR PACU (Radiology BMS) |
00016938 |
Alexander Urasaki |
BMS Device Inventory |
||
PET-CT, TDR (Radiology BMS) |
00016937 |
Alexander Urasaki |
BMS Device Inventory |
SIEM Migration & Monitoring
| Project | Code | Combo | Activity | PM | Parent |
|---|---|---|---|---|---|
SIEM Upgrade or Replacement FY26 |
000018281 |
Vanessa Ahn |
|||
QRadar → Sentinel Migration (LEAD) |
Vanessa Ahn |
SIEM Upgrade FY26 |
|||
Monad Pipeline Evaluation |
Vanessa Ahn |
SIEM Upgrade FY26 |
|||
Sentinel KQL Development |
Vanessa Ahn |
SIEM Upgrade FY26 |
|||
Centralized rsyslog Server |
Vanessa Ahn |
SIEM Upgrade FY26 |
|||
VNC Blocking (due mid-June) |
SIEM Upgrade FY26 |
Security & Compliance
| Project | Code | Combo | Activity | PM | Parent |
|---|---|---|---|---|---|
Abnormal Email Security FY26 |
000018379 |
Will Cox |
|||
Mandiant Remediation |
|||||
Firewall Audit |
|||||
Murus Portae (WAF/Segmentation) |
|||||
DMZ Migration |
|||||
Research Segmentation |
|||||
ISE Patch 10 / CVE Remediation |
ISE & Network Access
| Project | Code | Combo | Activity | PM | Parent |
|---|---|---|---|---|---|
ISE 3.2 → 3.5 Migration |
|||||
ISE Hardware Refresh |
✅ COMPLETE |
||||
ISE Annual Cert Renewal |
NEEDS CODE — on timesheets |
||||
IPSK Manager HA |
|||||
Enterprise Linux 802.1X / Remediation |
NEEDS CODE — on timesheets |
||||
Vocera EAP-TLS Supplicant Fix |
|||||
Strongline Gateway |
|||||
Spikewell BYOD VPN |
|||||
ChromeOS EAP-TLS |
Victor / Paul |
Deployments & Inventory
| Project | Code | Combo | Activity | PM | Parent |
|---|---|---|---|---|---|
BMS Device Inventory |
Alexander Urasaki |
||||
BMS Controller Segmentation |
BMS Device Inventory |
||||
TCP Clocks Deployment |
000016014 |
Chris Muburi |
60 hrs approved (2026-06-23) |
||
Downtime Computers Enforcement |
|||||
Tube System Upgrade |
NEEDS CODE — on timesheets |
||||
Disaster Recovery / Downtime Procedures |
|||||
IoT Dr. Kim Sleep Study |
Recurring |
||||
RAD Projects |
TBD |
Infrastructure & Networking
| Project | Code | Combo | Activity | PM | Parent |
|---|---|---|---|---|---|
ASA VPN Okta to Entra |
|||||
Linux Research / Server Deployment |
|||||
Network Diagram Library |
|||||
iTrack → Jira (Atlassian) Migration |
Operational / Administrative
| Project | Code | Combo | Activity | PM | Parent |
|---|---|---|---|---|---|
ISE Policy / General Support |
NEEDS CODE — ~3.5 hrs/week |
||||
Change Management / CRs |
NEEDS CODE — ~6 hrs/week |
||||
Admin / Documentation |
NEEDS CODE — ~1 hr/week |
||||
Meetings & Collaboration |
|||||
NebulaONE AI Platform |
|||||
InfoSec Reporting Dashboard |
P2 — NOT STARTED |
||||
iTrack → Jira Migration |
Standard Administrative Codes
| Field | Value | Notes |
|---|---|---|
Account |
605010 |
InfoSec Engineering |
Fund Code |
1010 |
|
Department |
84970000 |
|
PC Unit |
PC100 |
Activity Hour Baselines
Standard hour estimates per activity type. Use as guidance for consistent time reporting.
ISE / Network Policy
| Activity | Hours | Includes |
|---|---|---|
ISE Policy - MAC Auth |
3.0 |
Endpoint group, authz profile, policy rule, testing |
ISE Policy - Windows |
4.5 |
EAP-TLS/PEAP config, GPO, cert enrollment, testing |
ISE Policy - Linux |
4.0 |
EAP-TLS config, nmcli, cert enrollment, testing |
dACL Design |
3.5 |
ACE design, testing, documentation |
Authorization Profile |
3.0 |
Profile creation, VLAN/dACL assignment, testing |
Policy Set Design |
4.0 |
Full policy set with rules, conditions, testing |
WLAN / Wireless
| Activity | Hours | Includes |
|---|---|---|
SSID Design |
4.0 |
Parameters, auth, onboarding flow, documentation |
VLAN/dACL Design |
3.5 |
Segmentation, L3 policy, inter-VLAN access |
PSK/iPSK Design |
3.0 |
Credential lifecycle, rotation, scoping |
QoS/Multicast Design |
3.5 |
QoS classes, mDNS/Bonjour, streaming |
RF Survey |
4.0 |
Site survey, coverage analysis, recommendations |
AP Deployment |
3.0 |
Physical install, config, validation |
Change Management
| Activity | Hours | Includes |
|---|---|---|
Change Request |
3.5 |
CR draft, scope, rollback, risk, approvals |
CR Submission |
3.0 |
ServiceNow entry, evidence, CAB prep |
CAB Preparation |
2.0 |
Presentation, Q&A prep, stakeholder alignment |
Cutover Execution |
4.0 |
Implementation, verification, evidence capture |
Rollback Planning |
2.0 |
Rollback procedures, criteria, testing |
Meetings & Collaboration
| Activity | Hours | Includes |
|---|---|---|
Meeting Attendance |
1.0 |
Standard meeting participation |
Stakeholder Meeting |
1.0 |
Requirements, decisions, actions |
Workshop |
2.0 |
Hands-on session, training, deep-dive |
Vendor Call |
1.5 |
TAC case, product discussion, support |
Support & Operations
| Activity | Hours | Includes |
|---|---|---|
General Support |
2.0 |
Triage, investigation, resolution |
Post-Cutover Support |
2.5 |
Hypercare, monitoring, issue resolution |
Incident Response |
3.0 |
Investigation, containment, remediation |
Troubleshooting |
2.5 |
Root cause analysis, fix, documentation |
Discovery & Documentation
| Activity | Hours | Includes |
|---|---|---|
Discovery |
3.0 |
Requirements, inventory, constraints, risks |
Requirements Gathering |
2.5 |
Stakeholder interviews, documentation |
Architecture Design |
4.0 |
Solution design, diagrams, review |
Documentation |
2.0 |
Runbooks, procedures, knowledge base |
Security / Compliance
| Activity | Hours | Includes |
|---|---|---|
Security Review |
3.0 |
Design review, risk assessment |
Compliance Audit |
4.0 |
Evidence gathering, remediation |
Vulnerability Assessment |
3.5 |
Scan review, prioritization, remediation plan |
Risk Assessment |
2.5 |
Risk identification, scoring, mitigation |
Agent / Endpoint
| Activity | Hours | Includes |
|---|---|---|
Agent Deployment |
3.0 |
Install, config, validation |
Agent Removal |
2.5 |
Uninstall, cleanup, verification |
Policy Tuning |
3.5 |
Rule adjustment, testing, documentation |
GPO Configuration |
3.0 |
Policy creation, testing, deployment |
Time Entry Quick Reference
Daily Entry Workflow
-
Open PeopleSoft Time & Labor
-
Select pay period
-
Enter:
-
Project Code from table above
-
Activity (if required)
-
Hours worked
-
Description (activity performed)
-
Common Activity Descriptions
Copy-paste ready descriptions for time entries:
| Activity Type | Description Template |
|---|---|
ISE Policy Work |
ISE policy design/implementation - [endpoint type] authentication |
Meetings |
[Project name] - stakeholder meeting/requirements gathering |
Change Management |
CR preparation/submission/CAB - [project name] |
Troubleshooting |
[System] troubleshooting - [issue summary] |
Documentation |
Technical documentation - [deliverable name] |
Testing |
[System] testing/validation - [test type] |
Support |
Post-implementation support - [project name] |
Timesheets
Timesheet: 2026-06-01 — 2026-06-05
Monday 06-01
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Tube System Upgrade |
_ |
3.0 |
ISE batch onboard script debugging — fixed 7 |
Abnormal Security (ESA→EOP) |
_ |
2.0 |
Policy review prep — EOP cmdlet mapping (5 cmdlets), Jihad spreadsheet review, Tyler migration doc review |
ISE Policy / Change Management |
_ |
2.5 |
CR board prep — Guest ACL Hardening + Anonymous Identity Test. CR document review, lab validation planning |
CISSP Study / Admin |
_ |
0.5 |
Exam scheduling coordination |
Total |
8.0 |
Tuesday 06-02
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Change Management |
_ |
2.0 |
CR Board attendance — Guest ACL Hardening (APPROVED), Anonymous Identity Test (APPROVED). Post-approval coordination |
Linux Research / Server Deployment |
_ |
2.0 |
Linux Remediation kickoff meeting + inventory SQL query development (dc-run-sql) |
Abnormal Security (ESA→EOP) |
_ |
2.5 |
DKIM investigation (PowerShell shows disabled), ESA→EOP policy divergence analysis, d001 deliverable |
ISE Annual Cert Renewal |
_ |
1.0 |
Cert renewal meeting — 52 days to expiry, DigiCert CA, CSR generation prep |
Spectrum TV/GetWell iPad Refresh |
_ |
0.5 |
Android handheld scanners — ISE policy scoping for shared device auth (Argam escalation) |
Total |
8.0 |
Wednesday 06-03
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Abnormal Security (ESA→EOP) |
_ |
3.0 |
ESA mail flow policy divergence — full Five Canons analysis. ESA-Bypass skipping blacklist enforcement. EOP anti-spam BCL/SCL policy review |
ISE Annual Cert Renewal |
_ |
1.0 |
CSR generation commands prepared, d001 config staged |
QRadar → Sentinel / Monad |
_ |
1.5 |
Monad pipeline weekly sync with William Cox — FMC/ISE sources, transform design, jq↔GJSON translation reference |
Spectrum TV/GetWell iPad Refresh |
_ |
1.0 |
Getwell iPads — iPSK onboard 2 devices (4C:B9:10:9F:05:9F, C4:12:34:2D:F3:14) |
ISE Policy / General Support |
_ |
1.5 |
Carry-forward task management, CR implementation scheduling coordination (Guest ACL + Anonymous Identity) |
Total |
8.0 |
Thursday 06-04
| Project | Code | Hours | Activity Description |
|---|---|---|---|
QRadar → Sentinel / Monad |
_ |
4.0 |
Monad API discovery — JWT decode, OpenAPI spec, pipeline CRUD operations, edge constraints. Created ise-lab-v2 filtered pipeline via API |
ISE Annual Cert Renewal |
_ |
1.0 |
TLS cert fingerprint script + runbook created (d001 encrypted) |
Centralized rsyslog Server |
_ |
1.0 |
rsyslog central collector partial created (d001 encrypted) |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
ESA-Bypass investigation continued — policy divergence follow-ups |
Admin / PeopleSoft |
_ |
1.0 |
PeopleSoft codes tracker updated — all 28 active projects audited and mapped |
Total |
8.0 |
Friday 06-05
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Abnormal Security (ESA→EOP) |
_ |
2.0 |
ESA-Bypass policy divergence follow-ups, DKIM investigation continued, AutoForwarding remediation |
ISE Policy / General Support |
_ |
2.0 |
Carry-forward items: Tube System re-run coordination, Alex Pena device verification, Android scanners policy (June 8 deadline) |
Change Management |
_ |
1.5 |
Guest ACL + Anonymous Identity implementation scheduling with Tony Sun, David Rukiza, Argam |
Linux Research / Server Deployment |
_ |
1.5 |
Linux inventory discovery — query refinement, dc-run-sql validation |
Documentation / Admin |
_ |
1.0 |
Worklog triage, task prioritization, PeopleSoft code assignment |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
Abnormal Security (ESA→EOP) |
2.0 |
2.5 |
3.0 |
1.0 |
2.0 |
10.5 |
QRadar → Sentinel / Monad |
— |
— |
1.5 |
4.0 |
— |
5.5 |
Change Management / CRs |
2.5 |
2.0 |
— |
— |
1.5 |
6.0 |
ISE Annual Cert Renewal |
— |
1.0 |
1.0 |
1.0 |
— |
3.0 |
Tube System Upgrade |
3.0 |
— |
— |
— |
— |
3.0 |
Linux Research / Remediation |
— |
2.0 |
— |
— |
1.5 |
3.5 |
Spectrum/GetWell/Scanners |
— |
0.5 |
1.0 |
— |
— |
1.5 |
Centralized rsyslog |
— |
— |
— |
1.0 |
— |
1.0 |
ISE Policy / General Support |
— |
— |
1.5 |
— |
2.0 |
3.5 |
Admin / Documentation |
0.5 |
— |
— |
1.0 |
1.0 |
2.5 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-05-25 — 2026-05-29
Monday 05-25
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Holiday |
8.0 |
Memorial Day |
|
Total |
8.0 |
Tuesday 05-26
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
Zebra printer network issue — validated 217 Zebra devices via ISE DataConnect, 14,300 auths with 0 failures. Confirmed ISE auth is not root cause |
Abnormal Security (ESA→EOP) |
_ |
4.0 |
SEG-to-Defender migration — deployed all 5 MDO policy layers (Anti-Spam, Anti-Phish, Anti-Malware, Safe Attachments, Safe Links) via Exchange Online PowerShell. Validated with time-sliced message trace (37k delivered, 146 spam filtered) |
Total |
8.0 |
Wednesday 05-27
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Change Management |
_ |
3.0 |
Two iTrack changes prepared: WIR-M-01 guest ACL hardening (Page Ground switch, Tony Sun + Andrian Ledezma) and WIR-L-01 EAP anonymous identity MDM profiles (Argam Darbindian + Andrian Ledezma). Full rollback commands included |
MSCHAPv2 to EAP-TLS Migration |
_ |
3.0 |
GPO reports v2 — 8-report PowerShell suite: GPO→OU mapping, OU device census, security filtering, stale accounts, link conflicts, inheritance, GPO vs ISE reconciliation, migration readiness matrix |
ISE Policy / General Support |
_ |
2.0 |
chlxisecsftp investigation — 6-phase forensic ownership determination for mystery server 10.101.27.175 (Ben Castillo, 2019 build). SSH forensics, ISE cross-reference, AD/vCenter/CMDB evidence matrix |
Total |
8.0 |
Thursday 05-28
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
8.0 |
General support / admin (no worklog captured) |
Total |
8.0 |
Friday 05-29
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
8.0 |
General support / admin (no worklog captured) |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
Holiday (Memorial Day) |
8.0 |
— |
— |
— |
— |
8.0 |
ISE Policy / General Support |
— |
4.0 |
2.0 |
8.0 |
8.0 |
22.0 |
Abnormal Security (ESA→EOP) |
— |
4.0 |
— |
— |
— |
4.0 |
Change Management |
— |
— |
3.0 |
— |
— |
3.0 |
MSCHAPv2 to EAP-TLS Migration |
— |
— |
3.0 |
— |
— |
3.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-05-18 — 2026-05-22
Monday 05-18
| Project | Code | Hours | Activity Description |
|---|---|---|---|
QRadar → Sentinel / Monad |
_ |
5.0 |
ISE→Monad secure syslog integration — extracted Monad TLS cert chain, uploaded CA to ISE Trusted Certificates, configured Remote Logging Target (TCP 6514). Troubleshooting streaming errors in Monad console |
QRadar → Sentinel / Monad |
_ |
3.0 |
Created step-by-step runbook for ISE Remote Logging Target→Monad (cert extraction, ISE import, RLT config, logging categories, validation, troubleshooting). Encrypted as d001 partial |
Total |
8.0 |
Tuesday 05-19
| Project | Code | Hours | Activity Description |
|---|---|---|---|
QRadar → Sentinel / Monad |
_ |
4.0 |
Finalized ISE-to-Monad secure syslog runbook. Restructured as d001 partial for encrypt/decrypt lifecycle. Updated README with ISE→Monad section |
Documentation / Admin |
_ |
2.0 |
Carryover backlog updates — Monad/SIEM entries reflect ISE integration progress. Worklog maintenance |
ISE Policy / General Support |
_ |
2.0 |
General support — task triage, priority alignment |
Total |
8.0 |
Wednesday 05-20
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Documentation / Admin |
_ |
4.0 |
Security audit — encrypted all 231 plaintext .adoc files in d001. Removed gitignore whitelist exceptions. Token rotation identified as TODO |
ISE Policy / General Support |
_ |
4.0 |
General support / admin — PeopleSoft charge code verification, task management |
Total |
8.0 |
Thursday 05-21
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Documentation / Admin |
_ |
4.0 |
Completed d001 encryption — remaining 52 whitelisted plaintext files encrypted. Removed local gitignore overrides. Token rotation TODO carried forward |
ISE Policy / General Support |
_ |
4.0 |
General support / admin |
Total |
8.0 |
Friday 05-22
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
8.0 |
General support / admin (no CHLA-specific worklog detail captured) |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
QRadar → Sentinel / Monad |
8.0 |
4.0 |
— |
— |
— |
12.0 |
ISE Policy / General Support |
— |
2.0 |
4.0 |
4.0 |
8.0 |
18.0 |
Documentation / Admin |
— |
2.0 |
4.0 |
4.0 |
— |
10.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-05-11 — 2026-05-15
Monday 05-11
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
8.0 |
General support / admin (no worklog detail captured) |
Total |
8.0 |
Tuesday 05-12
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
8.0 |
General support / admin (no worklog detail captured) |
Total |
8.0 |
Wednesday 05-13
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
4.0 |
Standard migration report — 5-sheet DataConnect SQL (exec summary, weekly trend, wave breakdown, device detail, stale devices). 6,230 MSCHAPv2 devices, 69.2% progress. VPN/OEAP exclusions applied |
Abnormal Security (ESA→EOP) |
_ |
2.0 |
CAB approval follow-up — implementation scheduled 2026-05-14. Created cab-talking-points partial (elevator pitch, key points, anticipated Q&A) |
QRadar → Sentinel / Monad |
_ |
2.0 |
Overview updated — 3 secrets configured in CHLA tenant. 404 on DCE endpoint confirms path works, DCR not yet created. Blockers: Rule ID + Stream Name pending Victor/Mauricio |
Total |
8.0 |
Thursday 05-14
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
8.0 |
Sheet 6 (Policy Match by Protocol) — new SQL query: policy set x auth rule x auth profile x protocol with device counts. Added to standard report with Excel integration. Cert-based anonymous outer identity validation requirement identified |
Total |
8.0 |
Friday 05-15
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
5.0 |
Report automation — dc-run-sql.sh, build-enhanced-report.py (Catppuccin dashboard), build-full-report.py, device-detail-to-xlsx.py. Runbook created. SQL optimization: 90d→30d window, removed correlated subquery, fixed migration_wave bucketing |
MSCHAPv2 to EAP-TLS Migration |
_ |
2.0 |
d000 validation — all 6 SQL queries tested against home lab ISE 3.2. 5-table JOIN validated (48 cols). Full 6-sheet Excel pipeline end-to-end |
Documentation / Admin |
_ |
1.0 |
Separated concerns: project README (status/ownership), scripts README (tool reference), runbook (procedure) |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
— |
— |
4.0 |
8.0 |
7.0 |
19.0 |
ISE Policy / General Support |
8.0 |
8.0 |
— |
— |
— |
16.0 |
Abnormal Security (ESA→EOP) |
— |
— |
2.0 |
— |
— |
2.0 |
QRadar → Sentinel / Monad |
— |
— |
2.0 |
— |
— |
2.0 |
Documentation / Admin |
— |
— |
— |
— |
1.0 |
1.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-05-04 — 2026-05-08
Monday 05-04
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
iTrack #1929634 — CCE Dialysis connectivity (Jeff Begonia, MAC 00:18:7D:D6:69:38). iTrack #3129942 — Arcadia Echo machine (Mark James, wired 00:04:5F:7F:2A:56 + wireless A4:FC:77:4F:0D:73). Investigation prep and ERS/MnT query staging |
Firewall Audit |
_ |
2.0 |
Firewall audit project enhanced — 5 query templates added to fmc-discovery.adoc (prefilter, policy assignments, NAT, EtherChannel, access rules, deployment status). Quick Start runbook created |
CISSP Study / Admin |
_ |
1.0 |
CISSP timeline reset — June 1 → July 12 across 14 files (trackers, portfolio, nav, metadata, education). RHCSA deadline updated June 1 → Q3 2026 |
ISE Policy / Change Management |
_ |
1.0 |
Mandiant remediation follow-up. Guest ACL continued validation |
Documentation / Admin |
_ |
1.0 |
Stale adoc audit (14 files updated). pfSense → VyOS corrections in dossier |
Total |
8.0 |
Tuesday 05-05
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
INC-2026-05-05-isensix-down — VLAN mismatch root cause. Reassigned via ERS PUT. Fleet audit: 59+ iSensix devices, 14 stragglers identified. Arcadia Echo follow-up — device hitting correct Medical onboard rule |
MSCHAPv2 to EAP-TLS Migration |
_ |
2.0 |
MSCHAPv2 maintenance window active (Will). Coordination and monitoring |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
Abnormal platform continued research. Meeting prep |
Documentation / Admin |
_ |
1.0 |
iTrack ticket updates, general admin |
Total |
8.0 |
Wednesday 05-06
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
2.0 |
INC-2026-05-06-wireless-multi-device — Vocera/WYSE/neuro physicians (Duque Ground) emergency. ISE ruled out (zero RADIUS failures). Root cause: AP roaming/flapping. VP briefed with Grafana dashboard |
MSCHAPv2 to EAP-TLS Migration |
_ |
2.0 |
Protocol distribution report: 6,227 MSCHAPv2 devices, 14,249 EAP-TLS/TEAP (70% migrated). Per-wave platform guides built (Chromebooks, WYSE, Windows, macOS, iOS) |
Abnormal Security (ESA→EOP) |
_ |
1.5 |
Working session with Will Cox, Vanessa Ahn, Alex Mejia, vendor team. Architecture documented: MDO primary, Abnormal secondary. CR assigned for read/write permissions (CAB May 13) |
QRadar → Sentinel / Monad |
_ |
1.0 |
Monad vendor working session. siem-migration-playbook.adoc with D2 diagrams and meeting notes |
ISE Policy / Change Management |
_ |
1.0 |
Mandiant ACL remediation team doc — guest ACL lockdown. Renamed Guest-CWA-Redirect-v2. SMB 445 host validation queries |
Linux Research / Server Deployment |
_ |
0.5 |
Linux EAP-TLS deployment guide renamed. Team partials reorganized. CVE inventory moved to investigations |
Total |
8.0 |
Thursday 05-07
| Project | Code | Hours | Activity Description |
|---|---|---|---|
BMS Device Inventory |
_ |
2.0 |
7 VFD devices reassigned to IoT_Onboard. Built ise-batch-onboard.sh — reusable batch endpoint group assignment (mac-file, group-name, description). Lab tested on d000 |
ISE Policy / General Support |
_ |
2.5 |
INC-2026-05-07 Duque Ground physician connectivity (C-level escalation) — Dr Agers + Dr Joshi, 4 devices. Zero RADIUS failures. KDC cert EKU issue identified. Netlogon 5719 errors (hospital-wide DC reachability). C-level evidence response drafted |
QRadar → Sentinel / Monad |
_ |
1.5 |
Monad pipeline Sentinel output deployment — 4 technical partials (overview, Azure prereqs, config, validation). 3 blockers documented: Azure private network, tenant console error, DCR not created. Email draft to Monad vendor |
Abnormal Security (ESA→EOP) |
_ |
1.5 |
CR-2026-05-07-abnormal-read-write drafted — iTrack fields, 4 implementation phases, backout options, 5 testing sections. CAB May 13, implementation May 14. Jason Landeros implementer |
Documentation / Admin |
_ |
0.5 |
Tracker updates (9 files), investigation naming convention standardized |
Total |
8.0 |
Friday 05-08
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
CVE-2026-43284/CVE-2026-43500 (Dirty Frag) — kernel LPE investigation. Proved module autoload without privileges. Antora incident (4 partials). d001 enterprise assessment, CHLA mitigation plan, advisory, tracking matrix. WSL2 unpatched (6.18.26 vs required 6.18.28) |
ISE Policy / General Support |
_ |
1.5 |
Dirty Frag continued — applied blocklist mitigation, fixed false-sense-of-security in status check (4-state verdict). Enterprise advisory distributed |
MSCHAPv2 to EAP-TLS Migration |
_ |
1.0 |
MSCHAPv2 maintenance window monitoring. Will coordination |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
Abnormal CR follow-up — CAB preparation for May 13 |
Documentation / Admin |
_ |
0.5 |
Worklog updates, codex entries (lsof SSH session management, xargs/kill patterns) |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
3.0 |
4.0 |
2.0 |
2.5 |
5.5 |
17.0 |
MSCHAPv2 to EAP-TLS Migration |
— |
2.0 |
2.0 |
— |
1.0 |
5.0 |
Abnormal Security (ESA→EOP) |
— |
1.0 |
1.5 |
1.5 |
1.0 |
5.0 |
QRadar → Sentinel / Monad |
— |
— |
1.0 |
1.5 |
— |
2.5 |
BMS Device Inventory |
— |
— |
— |
2.0 |
— |
2.0 |
Firewall Audit |
2.0 |
— |
— |
— |
— |
2.0 |
ISE Policy / Change Management |
1.0 |
— |
1.0 |
— |
— |
2.0 |
CISSP Study / Admin |
1.0 |
— |
— |
— |
— |
1.0 |
Linux Research / Server Deployment |
— |
— |
0.5 |
— |
— |
0.5 |
Documentation / Admin |
1.0 |
1.0 |
— |
0.5 |
0.5 |
3.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-04-27 — 2026-05-01
Monday 04-27
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
Endpoint disconnect investigation scaffold for Rhey Aquino — F8:75:A4:F3:61:25 (d-mj0dntn2). Built full investigation structure: ERS lookup, MnT session, MnT auth history, DataConnect flapping query partials |
MSCHAPv2 to EAP-TLS Migration |
_ |
1.5 |
MSCHAPv2 migration prep — Will’s maintenance window opens 5/4. Pre-work planning and coordination |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
Abnormal Security platform research continued |
Documentation / Admin |
_ |
1.5 |
Build toolchain portability verification (domus-asciidoc-build for work WSL). Commit prep and staging for encrypted investigation files |
Total |
8.0 |
Tuesday 04-28
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
Rhey Aquino endpoint disconnect — pulled, decrypted, ran ERS/MnT/DataConnect queries against F8:75:A4:F3:61:25. Findings partial updated. Teams response |
ISE Policy / General Support |
_ |
1.5 |
Philips device onboard verification — D4:A2:CD:9D:13:3A confirmed authenticated to Medical_Onboard |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
Dashboard review, meeting notes follow-up |
ASA VPN Okta to Entra |
_ |
1.0 |
VPN split tunnel — Jenny’s response drafted, follow-up questions addressed |
MSCHAPv2 to EAP-TLS Migration |
_ |
1.0 |
Maintenance window prep — Will’s window 5/4. Pre-staging and coordination |
Documentation / Admin |
_ |
0.5 |
PeopleSoft time tracking |
Total |
8.0 |
Wednesday 04-29
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
ISE advisory CVSS 9.9 follow-up. Strongline Gateway VLAN coordination (38 days). k3s NAT verification (46 days) |
MSCHAPv2 to EAP-TLS Migration |
_ |
2.0 |
Wednesday cadence call. Action-item tracker updates per workstream |
QRadar → Sentinel / Monad |
_ |
1.5 |
Monad pipeline evaluation continued. Sentinel connector mapping follow-up |
Linux Research / Server Deployment |
_ |
1.0 |
Linux research continued (CISO priority). Enterprise Linux 802.1X follow-up |
Documentation / Admin |
_ |
0.5 |
iTrack ticket triage |
Total |
8.0 |
Thursday 04-30
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
2.5 |
JAMF cert subject change investigation (Drew Kaurloto) — validated EMAIL→emailAddress change has zero ISE impact. All cert auth profiles use SUBJECT_COMMON_NAME via ERS API |
QRadar → Sentinel / Monad |
_ |
2.0 |
Monad pipeline evaluation continued. SIEM migration workstream coordination |
ISE Policy / Change Management |
_ |
1.5 |
Mandiant remediation — Guest ACL lab validation. Q2 2026 assessment prep |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
Abnormal Security project scaffolded. Session notes structure established |
Documentation / Admin |
_ |
1.0 |
Worklog system improvements — make new-month (May scaffolded), month rollover automation. Stub detection in audit |
Total |
8.0 |
Friday 05-01
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
2.5 |
CVE-2026-31431 (Copy Fail) organizational response — detection script, mitigation proof document, testing across WSL2 (Arch/Fedora/Oracle Linux), RHEL built-in kernel discovery. David Ntashamaje MDE KQL identified 29 WSL devices |
ISE Policy / General Support |
_ |
2.0 |
Endpoint D-N45577 GPO resolution — root cause: device in wrong OU pushing PEAP instead of TEAP. Moved to Win11 OU, TEAP EAP-TLS working with user+machine chaining |
ISE Policy / General Support |
_ |
1.0 |
JAMF cert subject change (Drew Kaurloto) — ISE cert auth profiles validated, zero impact confirmed via ERS API |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
First Abnormal Security working session. Investigation scaffolded, README updated |
MSCHAPv2 to EAP-TLS Migration |
_ |
1.0 |
MSCHAPv2 migration prep — 3 days to maintenance window. Coordination with Will |
Documentation / Admin |
_ |
0.5 |
Build error fixes (28 xref errors), stale tracker refresh |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
4.0 |
4.5 |
3.0 |
2.5 |
5.5 |
19.5 |
MSCHAPv2 to EAP-TLS Migration |
1.5 |
1.0 |
2.0 |
— |
1.0 |
5.5 |
Abnormal Security (ESA→EOP) |
1.0 |
1.0 |
— |
1.0 |
1.0 |
4.0 |
QRadar → Sentinel / Monad |
— |
— |
1.5 |
2.0 |
— |
3.5 |
ASA VPN Okta to Entra |
— |
1.0 |
— |
— |
— |
1.0 |
ISE Policy / Change Management |
— |
— |
— |
1.5 |
— |
1.5 |
Linux Research / Server Deployment |
— |
— |
1.0 |
— |
— |
1.0 |
Documentation / Admin |
1.5 |
0.5 |
0.5 |
1.0 |
0.5 |
4.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-04-20 — 2026-04-24
Monday 04-20
| Project | Code | Hours | Activity Description |
|---|---|---|---|
QRadar → Sentinel / Monad |
_ |
4.0 |
Streamlined QRadar guide finalized (2 commits). SIEM migration report generated — xlsx, csv, json deliverables under d001. LogSource/offense/volume/window data collected |
ISE Policy / General Support |
_ |
1.5 |
CAB prep for SRT Research VLAN 233 (CHLA-Research) — talking points, scope, risk, rollback, test plan |
Linux Research / Server Deployment |
_ |
1.0 |
Data forensics toolchain installed (poppler, tesseract, imagemagick, exiftool, binwalk, testdisk, hashdeep). Local AI image analysis tested (minicpm-v via Ollama) |
MSCHAPv2 to EAP-TLS Migration |
_ |
1.0 |
Scheduled recurring Wednesday cadence call. Drafted invite list (8 stakeholders). Netapi endpoint report planning |
Documentation / Admin |
_ |
0.5 |
Mandiant remediation prep — Excel findings from 4/16, Guest ACL lab validation planning |
Total |
8.0 |
Tuesday 04-21
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Change Management |
_ |
2.0 |
CAB presentation at 15:00 — SRT Research VLAN 233 extension to 9 SRT access floors + distribution rename. APPROVED. Tony Sun implementor, Evan presenter/tester |
ISE Policy / General Support |
_ |
3.0 |
PRJ-downtime-computers ISE DataConnect wireless audit — built dc_query helper (Python + oracledb), v2 query (identity_group/endpoint_profile/authorization_rule). Results: 45 computers, 16 violating wireless, 29 compliant wired-only. Report v3 delivered to management |
QRadar → Sentinel / Monad |
_ |
1.0 |
SIEM migration report ready for stakeholder presentation. Connector mapping next step. Monad evaluation continued (43 days lead role) |
MSCHAPv2 to EAP-TLS Migration |
_ |
1.0 |
Scheduled recurring Wednesday cadence — invite list finalized (Tony Martinez, Mark Silva, Argam, Drew, Andrew, Jason, Victor, Justin). Action-item tracker build started |
Documentation / Admin |
_ |
1.0 |
GitHub API cross-repo activity audit (12 repos, 181 commits). Fixed git identity split in dots-quantum. ISE advisory CVSS 9.9 Patch 10 status check |
Total |
8.0 |
Wednesday 04-22
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
3.0 |
First recurring Wednesday cadence call. Presented netapi endpoint report (6,084 devices, 29 device types). Built action-item tracker per workstream (8 platforms) |
QRadar → Sentinel / Monad |
_ |
2.0 |
LogSourceType-to-Sentinel connector mapping. Monad pipeline evaluation continued (44 days) |
ISE Policy / General Support |
_ |
1.5 |
ISE advisory CVSS 9.9 Patch 10 check. ISE admin MFA enforcement recommendation. Dr. Kim iPSK device follow-up |
ISE Policy / Change Management |
_ |
1.0 |
Mandiant remediation — 4/16 findings Excel update. Guest ACL lab validation (GUEST_CWA_REDIRECT_MAX_SECURITY) |
Documentation / Admin |
_ |
0.5 |
PeopleSoft time tracking, iTrack ticket triage |
Total |
8.0 |
Thursday 04-23
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
P0 task backlog audit — identified 45-day-old blockers (k3s NAT, Wazuh indexer). Disaster Recovery scoping. Linux Research follow-up (CISO priority) |
QRadar → Sentinel / Monad |
_ |
2.0 |
Monad evaluation continued. Sentinel KQL proficiency development |
Documentation / Admin |
_ |
2.0 |
Landing page automation — added current-day/current-date/current-worklog attributes to antora.yml. Created make update-today-attrs target |
ISE Policy / Change Management |
_ |
1.0 |
Mandiant Q2 2026 assessment prep. Guest ACL lab follow-up |
Total |
8.0 |
Friday 04-24
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
ISE advisory tracking (CVSS 9.9). k3s NAT verification follow-up (44 days). Strongline Gateway VLAN follow-up (37 days). Enterprise Linux 802.1X standardization |
Linux Research / Server Deployment |
_ |
2.0 |
Linux research continued (CISO priority, behind schedule). Shahab/Ding deployment standardization |
Abnormal Security (ESA→EOP) |
_ |
1.5 |
Initial research on AI platform. ESA cutover timeline review |
DMZ Migration |
_ |
1.0 |
External services audit behind NetScaler — initial scoping |
Documentation / Admin |
_ |
0.5 |
iTrack ticket closure, PeopleSoft admin |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
QRadar → Sentinel / Monad |
4.0 |
1.0 |
2.0 |
2.0 |
— |
9.0 |
ISE Policy / General Support |
1.5 |
3.0 |
1.5 |
3.0 |
3.0 |
12.0 |
MSCHAPv2 to EAP-TLS Migration |
1.0 |
1.0 |
3.0 |
— |
— |
5.0 |
Change Management |
— |
2.0 |
— |
— |
— |
2.0 |
ISE Policy / Change Management |
— |
— |
1.0 |
1.0 |
— |
2.0 |
Linux Research / Server Deployment |
1.0 |
— |
— |
— |
2.0 |
3.0 |
Abnormal Security (ESA→EOP) |
— |
— |
— |
— |
1.5 |
1.5 |
DMZ Migration |
— |
— |
— |
— |
1.0 |
1.0 |
Documentation / Admin |
0.5 |
1.0 |
0.5 |
2.0 |
0.5 |
4.5 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-04-13 — 2026-04-17
Monday 04-13
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
P1 infrastructure incident — dual KVM hypervisor outage recovery. kvm-02 restored (6 VMs), bridge VLAN PVID mismatch corrected, NAS fstab hardened. kvm-01 fiber CRC errors on Te1/0/2, moved to Te1/0/8, 8 VMs started |
Meetings |
_ |
3.0 |
Onsite security team meeting — 5 workstreams: Abnormal Security ESA migration, Microsoft Defender MDE onboarding, Sentinel KQL library, Monad syslog level strategy (RFC 5424), Firewall/DMZ inventory. 12 action items assigned |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
ESA migration timeline discussion, quarantine alignment, rollback plan review (from meeting) |
QRadar → Sentinel / Monad |
_ |
1.0 |
Monad pipeline — approved syslog level 6 source list defined, detection gap analysis discussed (from meeting) |
Total |
8.0 |
Tuesday 04-14
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Abnormal Security (ESA→EOP) |
_ |
2.5 |
Meeting notes consolidation — Defender docs Linux toolchain organized, email policy search patterns, KQL query extraction patterns across security domains |
ISE Policy / General Support |
_ |
2.0 |
Morning WiFi diagnostics (CHLA-Remote profile verification, adapter enumeration, BSSID scanning). Infrastructure carryover from KVM incident |
Change Management |
_ |
1.5 |
CR-2026-04-15 SRT VLAN — iTrack submission preparation (due tomorrow) |
Documentation / Admin |
_ |
2.0 |
PowerShell codex — network diagnostics (WiFi profiles, adapter enumeration, WLAN discovery, service enumeration). PowerShell→JSON→jq bridge patterns |
Total |
8.0 |
Wednesday 04-15
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Change Management |
_ |
2.5 |
CR-2026-04-15 SRT Research VLAN — pre-change baseline captured and age-encrypted (access switch, Nexus distribution, ISE config). Change window execution |
Abnormal Security (ESA→EOP) |
_ |
2.0 |
Abnormal Security read-only O365/email integration completed during morning meeting. ESA migration upgraded to active evaluation phase |
ISE Policy / General Support |
_ |
2.0 |
ISE ERS/MnT/DataConnect API lab testing — endpoint CRUD, session queries, SQL queries via oracledb. Key discoveries: MnT XML responses, MAC-only reliable key, CoA target is NAS IP |
ISE Policy / General Support |
_ |
1.5 |
ISE endpoint group flapping incident (INC-2026-04-15) — IoT devices reverting from iPSK to GuestEndpoints. Root cause: MAB fallback overrides staticGroupAssignment. ERS API remediation |
Total |
8.0 |
Thursday 04-16
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
FMC REST API deep dive — live API calls against FMC, 8 FTDs enumerated across 3 datacenters, NetScaler DMZ zones discovered, Perimeter ACP confirmed empty. 25+ function ops script created |
Mandiant Remediation |
_ |
2.0 |
Mandiant guest ACL feedback preparation, SIEM report reproduction, findings documentation |
ISE Policy / General Support |
_ |
1.5 |
ISE endpoint flapping follow-up (INC-2026-04-16) — 2 endpoints reassigned via ERS API (DELETE+POST and PUT methods). PUT vs DELETE+POST pattern documented |
Documentation / Admin |
_ |
1.5 |
14 encrypted project data directories under d001/projects/ — new security standard for sensitive artifacts. Codex updates: age encryption, xargs+git pipelines |
Total |
8.0 |
Friday 04-17
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
2.5 |
MSCHAPv2 10:30 meeting — platform ownership matrix captured (8 platforms: GPOs, SCCM, Workspace ONE, Intune, JAMF, Vocera, Chrome, Wyse). Weekly Wednesday cadence call to schedule |
ISE Policy / General Support |
_ |
2.0 |
ISE DataConnect deep dive — multi-table SQL joins (auth methods, identity groups, RADIUS, profiler data). 10,387-line examples file. ISE analytics domain-agnostic reference created |
Change Management |
_ |
1.5 |
CR-2026-04-15 SRT VLAN submitted to iTrack. CAB presentation scheduled for 4/21 15:00. Architecture diagram and change plan finalized |
ISE Hardware Refresh |
_ |
1.0 |
ISE disaster recovery project scaffolded (P0) — DR priority ranking: ISE > Firewalls > Core switches > WLCs > DNS > SIEM. Node roles, critical-auth VLAN, restore procedures |
QRadar → Sentinel / Monad |
_ |
1.0 |
QRadar analysis runbook streamlined, QRadar-to-Sentinel collection updated. AQL query URL encoding techniques documented |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
3.0 |
2.0 |
3.5 |
4.5 |
2.0 |
15.0 |
Abnormal Security (ESA→EOP) |
1.0 |
2.5 |
2.0 |
— |
— |
5.5 |
Change Management |
— |
1.5 |
2.5 |
— |
1.5 |
5.5 |
Meetings |
3.0 |
— |
— |
— |
— |
3.0 |
MSCHAPv2 to EAP-TLS Migration |
— |
— |
— |
— |
2.5 |
2.5 |
Mandiant Remediation |
— |
— |
— |
2.0 |
— |
2.0 |
QRadar → Sentinel / Monad |
1.0 |
— |
— |
— |
1.0 |
2.0 |
Documentation / Admin |
— |
2.0 |
— |
1.5 |
— |
3.5 |
ISE Hardware Refresh |
— |
— |
— |
— |
1.0 |
1.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-04-06 — 2026-04-10
Monday 04-06
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
Standards framework — 20 RFC 2119 standards across 5 domains (Operations, Documentation, Security, AI, Workflow). Quality audit 400/400 criteria |
Mandiant Remediation |
_ |
2.0 |
Mandiant security remediation project — January pentest findings consolidated, evil twin ACL design, CVE-2026-20029 ISE XXE patching, dACL enforcement workstream |
QRadar → Sentinel / Monad |
_ |
1.5 |
QRadar → Sentinel restructure — converted to full project standard, 5 new partials, metadata/summary/overview |
Documentation / Admin |
_ |
1.5 |
16 spoke repo conversions to project standard, certification restructure, project management tooling |
Total |
8.0 |
Tuesday 04-07
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
General support — carry-forward item triage, ISE patch status verification, project portfolio review |
Documentation / Admin |
_ |
2.0 |
Work priorities documentation, repo synchronization, deployment verification |
Meetings |
_ |
2.0 |
Team coordination, project status updates |
Total |
8.0 |
Wednesday 04-08
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
General support — MSCHAPv2 migration planning continuation, endpoint report tooling preparation |
Abnormal Security (ESA→EOP) |
_ |
2.0 |
ESA → Abnormal Security evaluation — integration model research, cutover timeline assessment |
Documentation / Admin |
_ |
2.0 |
Work project tracking, blocker dashboard updates, certification progress tracking |
Total |
8.0 |
Thursday 04-09
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Meetings |
_ |
3.0 |
Manager 1:1 with Sarah Clizer — 8 project status review (Mandiant P0, Linux Research P0, iPSK Manager P0, MSCHAPv2 P0, CHLA Antora P1, SIEM Migration P1, ISE 3.4 P1, ISE HW Refresh P1) |
Mandiant Remediation |
_ |
2.0 |
Mandiant Q2 assessment timeline discussion, dACL enforcement status, posture/ACL remediation planning |
MSCHAPv2 to EAP-TLS Migration |
_ |
1.5 |
Migration planning review — resource allocation discussion, Chromebook + Wyse wave scoping |
ISE Policy / General Support |
_ |
1.5 |
ISE patch verification, k3s NAT blocker review (31 days), Wazuh indexer recovery status |
Total |
8.0 |
Friday 04-10
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
ISE codex restructure — promoted 7 POSIX tools to top-level categories, created 6 new tool codexes, updated STD-016. Operational reference material for ISE troubleshooting |
Documentation / Admin |
_ |
2.0 |
Build error fixes — unescaped pipes in tables, attribute warnings, 19 broken xref references after directory rename |
QRadar → Sentinel / Monad |
_ |
1.5 |
jq infrastructure queries (7 levels) — progressive examples from select() to multi-source joins for SIEM data processing |
Linux Research / Server Deployment |
_ |
1.5 |
Python dashboard suite — system inventory DataFrames (906 packages, 118 services, network interfaces, routes, ports). Infrastructure visibility tooling |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
3.0 |
4.0 |
4.0 |
1.5 |
3.0 |
15.5 |
Documentation / Admin |
1.5 |
2.0 |
2.0 |
— |
2.0 |
7.5 |
Mandiant Remediation |
2.0 |
— |
— |
2.0 |
— |
4.0 |
QRadar → Sentinel / Monad |
1.5 |
— |
— |
— |
1.5 |
3.0 |
Meetings |
— |
2.0 |
— |
3.0 |
— |
5.0 |
Abnormal Security (ESA→EOP) |
— |
— |
2.0 |
— |
— |
2.0 |
MSCHAPv2 to EAP-TLS Migration |
— |
— |
— |
1.5 |
— |
1.5 |
Linux Research / Server Deployment |
— |
— |
— |
— |
1.5 |
1.5 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-03-30 — 2026-04-03
Monday 03-30
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Documentation / Admin |
_ |
5.0 |
domus-captures cleanup — orphan page removal, template library (16 templates), nav structure repair, build warning triage |
ISE Policy / General Support |
_ |
3.0 |
ISE documentation review, Antora build verification, deployment fix (domus-docs playbook correction) |
Total |
8.0 |
Tuesday 03-31
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Documentation / Admin |
_ |
5.0 |
Documentation tooling — Ollama API doc endpoints (markdown converter, linter, session-to-worklog, summarizer), system maintenance |
ISE Policy / General Support |
_ |
3.0 |
ISE documentation infrastructure review, project tracking updates, carry-forward item triage |
Total |
8.0 |
Wednesday 04-01
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
2.5 |
Team meeting — leadership requesting netapi endpoint reports with pandas graphs, migration wave identification (Chromebooks + Wyse = ~2,000 endpoints) |
QRadar → Sentinel / Monad |
_ |
2.0 |
Microsoft Sentinel onboarding — Azure portal access, first KQL queries, log source schema review. QRadar migration lead role confirmed |
ISE Policy / General Support |
_ |
1.5 |
Vocera/Wyse iTrack RCA — TAC found RabbitMQ CPU spike on primary MnT, no definitive root cause. Endpoint mitigation via onboard identity group |
Abnormal Security (ESA→EOP) |
_ |
1.0 |
New project assigned — ESA → Abnormal Security API migration. Initial scope assessment |
Linux Research / Server Deployment |
_ |
1.0 |
Enterprise Linux 802.1X standardization — CISO concern about central management, DACL/VLAN assignment gaps |
Total |
8.0 |
Thursday 04-02
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
netapi ERS client modularization — split 5,091-line monolith into 15 mixin files, 113+ methods, Sphinx/Furo API docs for team review |
ISE Policy / General Support |
_ |
2.0 |
GCC ISE engagement — 3/4 nodes restored (password recovery + cert verification), PSN-04 deferred. TAC-2026-04-gcc-ise-cert-import documented |
Abnormal Security (ESA→EOP) |
_ |
1.5 |
PRJ-abnormal-security scaffolded — Cisco ESA → Abnormal API migration project scope and timeline |
Azure Legacy Migration |
_ |
1.5 |
PRJ-dmz-migration — external services audit behind NetScaler, DMZ assessment scoping |
Total |
8.0 |
Friday 04-03
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
Codex system buildout — 204 production-grade code snippets across 18 domains (bash, python, powershell, networking, security). ISE operational reference material |
Documentation / Admin |
_ |
2.0 |
Project tracking, carry-forward triage, work priorities documentation |
MSCHAPv2 to EAP-TLS Migration |
_ |
2.0 |
Migration planning — endpoint report preparation, pandas graph requirements scoping |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
3.0 |
3.0 |
1.5 |
5.0 |
4.0 |
16.5 |
Documentation / Admin |
5.0 |
5.0 |
— |
— |
2.0 |
12.0 |
MSCHAPv2 to EAP-TLS Migration |
— |
— |
2.5 |
— |
2.0 |
4.5 |
QRadar → Sentinel / Monad |
— |
— |
2.0 |
— |
— |
2.0 |
Abnormal Security (ESA→EOP) |
— |
— |
1.0 |
1.5 |
— |
2.5 |
Linux Research / Server Deployment |
— |
— |
1.0 |
— |
— |
1.0 |
Azure Legacy Migration |
— |
— |
— |
1.5 |
— |
1.5 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-03-23 — 2026-03-27
Monday 03-23
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Documentation / Admin |
_ |
4.0 |
Sustainable worklog system implementation — 7 section partials + 3 checkbox partials, modular architecture reducing daily worklogs from ~300 to ~50 lines |
ISE Policy / General Support |
_ |
3.0 |
Carry-forward backlog — Strongline Gateway status, k3s NAT verification, Wazuh indexer, Monad pipeline evaluation coordination |
QRadar → Sentinel / Monad |
_ |
1.0 |
Monad evaluation — continued pipeline testing and input source validation |
Total |
8.0 |
Tuesday 03-24
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Documentation / Admin |
_ |
4.0 |
AsciiDoc mentoring session — kramdoc (markdown→AsciiDoc) conversion, document structure, cross-references, Antora integration basics |
ISE Policy / General Support |
_ |
2.0 |
Carry-forward professional backlog review, ISE TAC case monitoring (S2 post-reboot), task prioritization |
QRadar → Sentinel / Monad |
_ |
2.0 |
Claude Code Features project — data pipeline YAML architecture (92 projects, 8 categories), automation planning for Monad integration |
Total |
8.0 |
Wednesday 03-25
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
Carry-forward backlog — Strongline Gateway verification, ISE TAC case S2 monitoring, Vocera EAP-TLS follow-up, pending ISE Patch 9 coordination |
Documentation / Admin |
_ |
2.0 |
AsciiDoc mentoring carryover topics — document structure, tables, code blocks, cross-references |
Change Management |
_ |
2.0 |
CR documentation — dots-quantum tmux package change request, stow compatibility audit methodology (applicable to CHLA config management) |
Total |
8.0 |
Thursday 03-26
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
3.0 |
netapi security hardening — patched 4 Dependabot vulnerabilities (cryptography, pyasn1, requests, python-socketio), unified exception hierarchy |
QRadar → Sentinel / Monad |
_ |
2.0 |
netapi test infrastructure — pytest fixtures, 18 ISE ERS unit tests, mock API responses, 22% coverage on ERS client |
Documentation / Admin |
_ |
2.0 |
Carry-forward backlog review (8 items, 9-16 days carried), AsciiDoc mentoring topics remaining, work priority assessment |
ISE Policy / Change Management |
_ |
1.0 |
Nav-explore enhancement planning — antora.yml attribute requirements for 16 components, blocked item documentation |
Total |
8.0 |
Friday 03-27
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
Carry-forward backlog — ISE TAC case S2 monitoring, Strongline Gateway verification, Monad pipeline status, Wazuh indexer recovery coordination |
Documentation / Admin |
_ |
2.0 |
Shell Scripting Guide structure — 23 chapter study templates, combined study plan for Linux Bible + Shell Scripting Guide, AsciiDoc grep patterns reference |
CISSP Study / Admin |
_ |
2.0 |
DELE C1 Spanish lesson prep and session — subjunctive clauses, discourse connectors, essay structure review (cross-training communication skills) |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
3.0 |
2.0 |
4.0 |
3.0 |
4.0 |
16.0 |
Documentation / Admin |
4.0 |
4.0 |
2.0 |
2.0 |
2.0 |
14.0 |
QRadar → Sentinel / Monad |
1.0 |
2.0 |
— |
2.0 |
— |
5.0 |
Change Management |
— |
— |
2.0 |
1.0 |
— |
3.0 |
CISSP Study / Admin |
— |
— |
— |
— |
2.0 |
2.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-03-16 — 2026-03-20
Monday 03-16
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
ISE incident prep — stakeholder defense points for CISO/leadership (Sarah Clizer, Jonathan Carr, Albert Rodriguez), TAC case S2 status, PSN auth validation |
ISE Policy / Change Management |
_ |
2.0 |
Strongline Gateway VLAN remediation — 8 devices in wrong ISE identity group, CSV import misassignment, incident documentation (INC-2026-03-16) |
QRadar → Sentinel / Monad |
_ |
1.0 |
Monad Pipeline evaluation prep — quick diagnostic commands, pipeline input source research |
Documentation / Admin |
_ |
1.0 |
Comprehensive backlog audit — 8 professional tasks catalogued with days-carried metrics, regex drill system completion |
Total |
8.0 |
Tuesday 03-17
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / Change Management |
_ |
3.0 |
Strongline Gateway VLAN fix (blocking Arin) — identity group reassignment for 8 devices, ISE endpoint verification |
ISE Policy / General Support |
_ |
2.0 |
k3s NAT verification (8 days carried) — NAT rule 170 for 10.42.0.0/16 pod network, Wazuh indexer recovery coordination |
QRadar → Sentinel / Monad |
_ |
2.0 |
Monad Pipeline evaluation (6 days carried) — pipeline creation testing, input source validation |
Documentation / Admin |
_ |
1.0 |
PeopleSoft time entry system creation — project codes table, activity baselines, biweekly tracking template |
Total |
8.0 |
Wednesday 03-18
| Project | Code | Hours | Activity Description |
|---|---|---|---|
Documentation / Admin |
_ |
3.0 |
PeopleSoft time entry (CRITICAL) — scalable time tracking system, 4 project codes mapped (Recognition Kiosk, Spectrum/GetWell, Secure Endpoint, Win11 Hardening) |
ISE Policy / Change Management |
_ |
2.0 |
Strongline Gateway VLAN — continued remediation, ISE endpoint group verification, Arin coordination |
ISE Policy / General Support |
_ |
2.0 |
k3s NAT verification (9 days), Wazuh indexer recovery coordination, carry-forward task triage |
QRadar → Sentinel / Monad |
_ |
1.0 |
Monad quick start — pipeline listing, input source search for Cisco integrations |
Total |
8.0 |
Thursday 03-19
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
Carry-forward backlog attack — Strongline Gateway follow-up, k3s NAT verification (10 days), Wazuh recovery coordination |
QRadar → Sentinel / Monad |
_ |
2.0 |
Monad Pipeline evaluation (8 days carried) — continued pipeline creation testing, input/output configuration |
Documentation / Admin |
_ |
2.0 |
Professional backlog audit, PeopleSoft time reconciliation, task prioritization review |
Total |
8.0 |
Friday 03-20
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
Carry-forward items — Strongline Gateway VLAN verification (4 days), k3s NAT verification (11 days), Wazuh indexer status check |
QRadar → Sentinel / Monad |
_ |
2.0 |
Monad Pipeline evaluation (9 days) — continued testing, pipeline management commands |
Documentation / Admin |
_ |
2.0 |
Backlog review, carry-forward item documentation, work priority reassessment |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
4.0 |
2.0 |
2.0 |
4.0 |
4.0 |
16.0 |
ISE Policy / Change Management |
2.0 |
3.0 |
2.0 |
— |
— |
7.0 |
QRadar → Sentinel / Monad |
1.0 |
2.0 |
1.0 |
2.0 |
2.0 |
8.0 |
Documentation / Admin |
1.0 |
1.0 |
3.0 |
2.0 |
2.0 |
9.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Timesheet: 2026-03-09 — 2026-03-13
Monday 03-09
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
5.0 |
ISE deployment review, VyOS zone-based firewall architecture study (cross-platform NAC knowledge), NAT rule analysis for pod networking |
QRadar → Sentinel / Monad |
_ |
2.0 |
Monad pipeline evaluation prep — research input sources, transform architecture, pipeline management |
Documentation / Admin |
_ |
1.0 |
Open-source NAC alternatives research (PacketFence, FreeRADIUS) — ISE feature gap analysis |
Total |
8.0 |
Tuesday 03-10
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
8.0 |
General support, carried-over task review, Vault HA failover verification, vault-backup SELinux fix, vault-ssh-sign HA update |
Total |
8.0 |
Wednesday 03-11
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
3.0 |
Vocera EAP-TLS supplicant fix — ~10 phones failing 802.1X, MAC lookup queries, ISE DataConnect auth history, bulk CoA reauth prep |
QRadar → Sentinel / Monad |
_ |
2.0 |
Monad CLI enhancement — 7 new commands (input-create, quick-pipeline, graph, health, clone, watch, inputs --type filter) |
ISE Policy / General Support |
_ |
2.0 |
ISE TAC case prep expansion — certificate diagnostics, time-based analysis, VLAN analysis, security analysis, EAP method analysis (+1192 lines) |
Documentation / Admin |
_ |
1.0 |
netapi git forge CLI integration (GitHub/GitLab/Gitea) — 65 commands with -f json support for automation |
Total |
8.0 |
Thursday 03-12
| Project | Code | Hours | Activity Description |
|---|---|---|---|
ISE Policy / General Support |
_ |
4.0 |
CHLA ISE TAC Case S1 — ~500 endpoints failing 802.1X, Primary MNT RabbitMQ at 109% CPU, node reboot, post-reboot validation, ECCRB submission |
MSCHAPv2 to EAP-TLS Migration |
_ |
2.0 |
EAP-TLS chain fix investigation — client cert missing intermediate CA, ISE error 5411/12935 analysis, cert chain validation |
Documentation / Admin |
_ |
1.0 |
TAC case documentation — D2 deployment diagram, MNT diagnostics added to ise-tac-case-prep.adoc |
ISE Policy / General Support |
_ |
1.0 |
Security hardening audit — exposed Docker ports (Redis 6379, PostgreSQL 5432), rpcbind on 0.0.0.0:111 identified and fixed |
Total |
8.0 |
Friday 03-13
| Project | Code | Hours | Activity Description |
|---|---|---|---|
MSCHAPv2 to EAP-TLS Migration |
_ |
4.0 |
WiFi DHCP failure RCA — root cause identified: IP conflict + MAC randomization breaking ISE session tracking. RCA-2026-03-13-001 created |
ISE Policy / General Support |
_ |
2.0 |
WPA2-PSK fallback connection documented for EAP-TLS infrastructure outages, nmcli reference section created |
Documentation / Admin |
_ |
2.0 |
First RCA document using case-studies template, backlog audit and carryover triage |
Total |
8.0 |
Weekly Summary by Project
| Project | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
ISE Policy / General Support |
5.0 |
8.0 |
2.0 |
5.0 |
2.0 |
22.0 |
MSCHAPv2 to EAP-TLS Migration |
— |
— |
3.0 |
2.0 |
4.0 |
9.0 |
QRadar → Sentinel / Monad |
2.0 |
— |
2.0 |
— |
— |
4.0 |
Documentation / Admin |
1.0 |
— |
1.0 |
1.0 |
2.0 |
5.0 |
Daily Total |
8.0 |
8.0 |
8.0 |
8.0 |
8.0 |
40.0 |
Related
-
Work Tracker - Project priorities
-
Operations - Current tasks
-
ISE Hardware Refresh - Related project